Discover Opportunities months before the RFP drops
Learn more →Provide Construction Management at Risk ("CMAR") firm to provide professional Estimates and Constructability Review during the design phases while providing Management and Construction Services as well as Commissioning Activities during the renovation of Mitchell Engineering to build out a clean room of approx. 4,000 GSF.
Posted Date
Sep 5, 2025
Due Date
Nov 21, 2025
Release: Sep 5, 2025
Close: Nov 21, 2025
Provide Construction Management at Risk ("CMAR") firm to provide professional Estimates and Constructability Review during the design phases while providing Management and Construction Services as well as Commissioning Activities during the renovation of Mitchell Engineering to build out a clean room of approx. 4,000 GSF.
Work includes historic renovations to replace the slate roof, flat roofs and point/repair various site retaining stone walls; reroof the entire university chapel; removal of existing built-up and slate roof systems & associated insulation; install new roofing membrane systems over the flat roofs; install new slate shingle roofing systems over the sloped slate roof areas; final connections into new underground storm water piping; restoration of existing stone retaining walls and chimneys. See attached file.
Posted Date
Aug 8, 2025
Due Date
Oct 14, 2025
Release: Aug 8, 2025
Close: Oct 14, 2025
Work includes historic renovations to replace the slate roof, flat roofs and point/repair various site retaining stone walls; reroof the entire university chapel; removal of existing built-up and slate roof systems & associated insulation; install new roofing membrane systems over the flat roofs; install new slate shingle roofing systems over the sloped slate roof areas; final connections into new underground storm water piping; restoration of existing stone retaining walls and chimneys. See attached file.
Work includes to construct decorative stone and metal fencing along the campus perimeter also including general engineering, utility location, inspection and testing service.
Posted Date
Jul 3, 2025
Due Date
Jul 18, 2025
Release: Jul 3, 2025
Close: Jul 18, 2025
Work includes to construct decorative stone and metal fencing along the campus perimeter also including general engineering, utility location, inspection and testing service.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis