Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Metropolitan Topeka Airport Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
TOP Fuel Service General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Metropolitan Topeka Airport Authority
DESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Metropolitan Topeka Airport Authority
Close: Feb 3, 2026
DESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
AvailableMetropolitan Topeka Airport Authority
Installation of approx. 2475 feet of security/wildlife fence along the west side of the airport and at the access point to the apron. The first section in this process will be the installation of approx. 35 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire between Hangar 7 and Hangar 9. Section 2 of this project includes the installation of approx. 200 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire fence plus one (1) pedestrian gate. This fence will be located adjacent to the parking lot between Building 4A and Hangar 26. The pedestrian gate will be installed immediately adjacent to Hangar 26 and shall be operated using a key pad with a minimum of 200 available codes. Section 3 includes the installation of approx. 2,230 feet of 96”, 9ga GAW with 3 strands of barbed wire at the top and a 20’ automatic gate. The gate will be located at the corner of Hangar 26, approx. 20 feet from the building. The gate shall be operated using a key pad with a minimum of 200 available codes.
Posted Date
Nov 3, 2025
Due Date
Nov 14, 2025
Release: Nov 3, 2025
Metropolitan Topeka Airport Authority
Close: Nov 14, 2025
Installation of approx. 2475 feet of security/wildlife fence along the west side of the airport and at the access point to the apron. The first section in this process will be the installation of approx. 35 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire between Hangar 7 and Hangar 9. Section 2 of this project includes the installation of approx. 200 feet of 96” 9ga GAW security fencing with 3 strands of barbed wire fence plus one (1) pedestrian gate. This fence will be located adjacent to the parking lot between Building 4A and Hangar 26. The pedestrian gate will be installed immediately adjacent to Hangar 26 and shall be operated using a key pad with a minimum of 200 available codes. Section 3 includes the installation of approx. 2,230 feet of 96”, 9ga GAW with 3 strands of barbed wire at the top and a 20’ automatic gate. The gate will be located at the corner of Hangar 26, approx. 20 feet from the building. The gate shall be operated using a key pad with a minimum of 200 available codes.
Metropolitan Topeka Airport Authority
Project will replace multiple air handling units, unit heaters, heating water pumps, heating water piping\r and VAV terminal units. The project will include duct modifications, and new digital control system.
Posted Date
Sep 9, 2025
Due Date
Oct 14, 2025
Release: Sep 9, 2025
Metropolitan Topeka Airport Authority
Close: Oct 14, 2025
Project will replace multiple air handling units, unit heaters, heating water pumps, heating water piping\r and VAV terminal units. The project will include duct modifications, and new digital control system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.