Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Metropolitan Topeka Airport Authority
One (1) new fire 3,000 gallon tanker.
Posted Date
Apr 23, 2026
Due Date
Jul 13, 2026
Release: Apr 23, 2026
Metropolitan Topeka Airport Authority
Close: Jul 13, 2026
One (1) new fire 3,000 gallon tanker.
AvailableMetropolitan Topeka Airport Authority
Work includes, 350 LF, Installation and Removal of Inlet Protection. 12,843 LF, Joint and Crack Repair. 42,438 SY, Cold Milling (0" - 4"). 3,000 SY, Pavement Patching, Complete. 3,264 CY, Embankment in Place (Contractor Furnished). 8,680 TON, Asphalt Mix Pavement - Overlay. 5,941 GAL, Emulsified Asphalt Tack Coat. 38,893 SF, Temporary Pavement Marking (White). 45,613 SF, Reflectorized Pavement Marking (White). 25,387 SF, Emulsified Asphalt Slurry Seal Surface Treatment (Non-Eligible). 11,276 LF, #6 Bare Copper Counterpoise Direct Buried. 14,109 LF, #8 5kV L-824 Type C Cable in Conduit. 7,433 LF, (1) 2” PVC in Saw Kerf. 3,717 LF, (1) 2” PVC Direct Buried. 9 EA, Lighted Guidance Sign L-858L, Size 2 and Base.
Posted Date
Apr 17, 2026
Due Date
May 13, 2026
Release: Apr 17, 2026
Metropolitan Topeka Airport Authority
Close: May 13, 2026
Work includes, 350 LF, Installation and Removal of Inlet Protection. 12,843 LF, Joint and Crack Repair. 42,438 SY, Cold Milling (0" - 4"). 3,000 SY, Pavement Patching, Complete. 3,264 CY, Embankment in Place (Contractor Furnished). 8,680 TON, Asphalt Mix Pavement - Overlay. 5,941 GAL, Emulsified Asphalt Tack Coat. 38,893 SF, Temporary Pavement Marking (White). 45,613 SF, Reflectorized Pavement Marking (White). 25,387 SF, Emulsified Asphalt Slurry Seal Surface Treatment (Non-Eligible). 11,276 LF, #6 Bare Copper Counterpoise Direct Buried. 14,109 LF, #8 5kV L-824 Type C Cable in Conduit. 7,433 LF, (1) 2” PVC in Saw Kerf. 3,717 LF, (1) 2” PVC Direct Buried. 9 EA, Lighted Guidance Sign L-858L, Size 2 and Base.
Metropolitan Topeka Airport Authority
Rehabilitation of Taxiway Alpha includes, 4,657 LF , Rehabilitation of Taxiway Alpha. 51,630 SY, Type A Pavement Removal. 9,160 SY, Type B Pavement Removal. 1,864 SY, Cold Milling (0" - 4"). 51,964 SY, Lime-Treated Subgrade. 40,197 SY, Cement Treated Permeable Base Course (CTPB) (6”). 29,925 SY, Portland Cement Concrete Pavement (16.5"). 91,887 SF, Pavement Marking Removal. 5,218 SF, Reflectorized Pavement Marking (Yellow). 56,411 SF, Reflectorized Pavement Marking (White). 1,773, LF, 24" Reinforced Concrete Pipe (Class V). 7,426 LF, 6" Perforated Underdrain (Complete). 509 LF, 6" Non-Perforated Underdrain Outlet. 19,365 LF, #8 5KV L-824 Type C Lighting Cable In Conduit. 8,890 LF, (1) 2" PVC Schedule 40 Conduit Direct Buried.
Posted Date
Mar 10, 2026
Due Date
May 20, 2026
Release: Mar 10, 2026
Metropolitan Topeka Airport Authority
Close: May 20, 2026
Rehabilitation of Taxiway Alpha includes, 4,657 LF , Rehabilitation of Taxiway Alpha. 51,630 SY, Type A Pavement Removal. 9,160 SY, Type B Pavement Removal. 1,864 SY, Cold Milling (0" - 4"). 51,964 SY, Lime-Treated Subgrade. 40,197 SY, Cement Treated Permeable Base Course (CTPB) (6”). 29,925 SY, Portland Cement Concrete Pavement (16.5"). 91,887 SF, Pavement Marking Removal. 5,218 SF, Reflectorized Pavement Marking (Yellow). 56,411 SF, Reflectorized Pavement Marking (White). 1,773, LF, 24" Reinforced Concrete Pipe (Class V). 7,426 LF, 6" Perforated Underdrain (Complete). 509 LF, 6" Non-Perforated Underdrain Outlet. 19,365 LF, #8 5KV L-824 Type C Lighting Cable In Conduit. 8,890 LF, (1) 2" PVC Schedule 40 Conduit Direct Buried.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Metropolitan Topeka Airport Authority
The board meeting agenda includes action items such as the approval of a self-serve fueling proposal for Billard, the selection of a board secretary, and the consideration of rent abatement to reimburse tenant improvements. Additionally, the board will consider purchasing a mini-excavator, approving a water pump quote, and authorizing a siding project for Building 225. The meeting also features informational reports covering project updates, aviation and air service issues, maintenance, fuel sales, leasing and economic development activity, and financial reports, as well as an executive session.
Key discussions during this meeting included a public comment period where a taxpayer expressed opposition to bond resolutions and questioned expenditures related to mowing and historical asset sales. Another member voiced dissatisfaction with the timeline for receiving a KORA request, to which administrative staff attributed delays to recent illness-related staff shortages. The Board deliberated extensively on establishing 1-year, 3-year, and 5-year strategic plans, involving consultations with legal counsel and scheduling presentations from Olsson Associates. A significant item involved delaying a Bond Sale Resolution (Resolution 26-311) until better bond ratings could be secured, which resulted in rescheduling the next meeting. Project updates covered bid plans submission to the FAA for Billard 18-36 and Topeka Taxiway A, progress on the Billard fence project, FAA approval for the Billard Tower airspace, installation of a new generator at the Topeka Terminal, and ongoing fuel truck maintenance issues. Economic development activity included finalization of Davcon documents and progression on the 60-day Due Diligence agreement.
The meeting commenced with an adoption of an amended agenda, moving an action item and a presentation order. Key discussions included a presentation regarding an agreement with Davcon concerning the necessity and timeline for an Environmental Assessment for Hangar No. 619, requiring FAA and potentially SHPO approval, regardless of the final site selection for the MRO Hangar. The Board subsequently approved a quote not to exceed $80,000 from Coffman Associates for this Environmental Assessment. Additionally, Olsson provided a presentation on partnering with the Board to develop a realistic short-term and long-term strategic plan.
The meeting addressed several key items, including the adoption of a modified agenda which included an executive session to discuss board policies and leasing matters. The Board considered revisions to MTAA Bylaws, specifically a motion to amend the required written notice period for public comments from three business days to one business day, pending a vote in the subsequent meeting. The Board accepted a bid from Kansas Fencing for the Billard Fence Project totaling $86,110.00 and approved paying a $10,000 deductible related to a Billard tenant loss, while also negotiating a lease amendment. Officers were elected for the upcoming term. Resolutions authorizing depository signatures were approved to transfer signing authority from the outgoing Chairman to the incoming Chairman. The Board also decided to continue with existing cost-share agreement negotiations regarding the cost of sewer repairs at Billard. Information items covered project updates, aviation issues, maintenance reports, financial reports, and economic development activities.
The agenda includes a public hearing on the 2026 budget, specifically addressing the intent to exceed the Revenue Neutral Rate (RNR). It involves inquiring about notifications for MTAA Board Meetings, adopting the agenda, and a roll-call vote on exceeding the RNR with the adoption of Resolution No. 25-307. The hearing also covers the 2026 Proposed Budget, with a consideration for its adoption and authorization for certification to the Shawnee County Clerk.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Metropolitan Topeka Airport Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge