Connection to Bluebonnet Water Improvements
Posted
Sep 10, 2026
Sep 29, 2026
Work includes 902 LF 16" c900 pvc (dr-18) (all depths) including all excavation and backfill (off-street trench); 20 LF 16" c900 pvc (dr-18) installed in 24" c900 pvc encasement (all joints restrained); 20 LF 30" casing pipe installed by open cut including all excavation and backfill; 4 EA 16" 45 bend, di, mj; 1 LS 10" meter and vault, including meter, valves, concrete vault and hatch, piping, fittings, excavation and backfill, complete and in place; 1 LS 10" dcda and vault, including double-check detector assembly, valves, concrete vault and hatch, piping, fittings, excvation and backfill, complete and in place. See attached file.