Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Marion Boac Airport
Work includes approx. 64 LF of 6" pipe underdrain type 4; 3 EA of inspection holes/cleanout; 264 LF of join sealant concrete;18 SY of 401 HMA, 2, 64 surface course; 80 SF of pavement marking; building fabrication; building heating system, electrical, concrete floor.
Posted Date
May 4, 2026
Due Date
Jun 3, 2026
Release: May 4, 2026
Marion Boac Airport
Close: Jun 3, 2026
Work includes approx. 64 LF of 6" pipe underdrain type 4; 3 EA of inspection holes/cleanout; 264 LF of join sealant concrete;18 SY of 401 HMA, 2, 64 surface course; 80 SF of pavement marking; building fabrication; building heating system, electrical, concrete floor.
AvailableMarion Boac Airport
Construction of a new aviation bulk storage and direct to aircraft fueling facility at the airport. The new fueling facility will consist of two (2) 12,000-gallon above ground storage tanks and associated pump and filtration equipment – One (1) tank is intended to store "Jet-A" fuel & One (1) tank is intended to store "Avgas" (100LL). Also included as part of this project is one (1) complete pumping/filtering equipment skid for direct to aircraft dispensing, refueler loading and delivery transport unloading. One (1) existing, 10,000-gallon underground tank and associated dispensing skid will be removed as well.
Posted Date
Jan 31, 2025
Due Date
Mar 3, 2025
Release: Jan 31, 2025
Marion Boac Airport
Close: Mar 3, 2025
Construction of a new aviation bulk storage and direct to aircraft fueling facility at the airport. The new fueling facility will consist of two (2) 12,000-gallon above ground storage tanks and associated pump and filtration equipment – One (1) tank is intended to store "Jet-A" fuel & One (1) tank is intended to store "Avgas" (100LL). Also included as part of this project is one (1) complete pumping/filtering equipment skid for direct to aircraft dispensing, refueler loading and delivery transport unloading. One (1) existing, 10,000-gallon underground tank and associated dispensing skid will be removed as well.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge