Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lower Valley Water District
Construction and installation of the following work: the work covered under this contract consists of furnishing and installing a new sanitary sewer line for the lower valley water district (mesa verde sanitary sewer improvements). The project includes furnishing and installing gravity sewer piping and appurtenances, sewer service laterals (short and long), manholes, trench safety system, traffic control plan and implementation, removal and replacement of existing hmac, removal of base or subgrade material, installation of flowable fill, removal and replacement of concrete, gravel, screening, and/or pavement driveways, potholing, protection of power poles, water meters, telephone lines, trees, chain link fence, gas lines, street signs, fences and property walls.
Posted Date
Sep 18, 2025
Due Date
Oct 8, 2025
Release: Sep 18, 2025
Lower Valley Water District
Close: Oct 8, 2025
Construction and installation of the following work: the work covered under this contract consists of furnishing and installing a new sanitary sewer line for the lower valley water district (mesa verde sanitary sewer improvements). The project includes furnishing and installing gravity sewer piping and appurtenances, sewer service laterals (short and long), manholes, trench safety system, traffic control plan and implementation, removal and replacement of existing hmac, removal of base or subgrade material, installation of flowable fill, removal and replacement of concrete, gravel, screening, and/or pavement driveways, potholing, protection of power poles, water meters, telephone lines, trees, chain link fence, gas lines, street signs, fences and property walls.
Lower Valley Water District
Construction and installation of the following work: The improvements for this project consist of the installation of approx 6,000 LF of 12" dia PVC potable water pipe; approx 20 LF of 8" dia PVC potable water pipe; approx 90 LF of 2" dia PVC; approx 19- 12" gate valves; approx 1- Tapping Sleeve assembly; approx 135 LF of 24" dia steel casing and 50 LF of 4" dia steel casing by boring methods; approx 12 fire hydrants assemblies; new water service connections; pavement removal and replacement; trench safety system; videotaping of project site before and after construction, and a traffic control plan/operation.
Posted Date
Sep 18, 2025
Due Date
Oct 8, 2025
Release: Sep 18, 2025
Lower Valley Water District
Close: Oct 8, 2025
Construction and installation of the following work: The improvements for this project consist of the installation of approx 6,000 LF of 12" dia PVC potable water pipe; approx 20 LF of 8" dia PVC potable water pipe; approx 90 LF of 2" dia PVC; approx 19- 12" gate valves; approx 1- Tapping Sleeve assembly; approx 135 LF of 24" dia steel casing and 50 LF of 4" dia steel casing by boring methods; approx 12 fire hydrants assemblies; new water service connections; pavement removal and replacement; trench safety system; videotaping of project site before and after construction, and a traffic control plan/operation.
Lower Valley Water District
Seeking Employee Insurance Benefits Consultant and Brokerage Services.
Posted Date
Apr 7, 2026
Due Date
Apr 16, 2026
Release: Apr 7, 2026
Lower Valley Water District
Close: Apr 16, 2026
Seeking Employee Insurance Benefits Consultant and Brokerage Services.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lower Valley Water District
The strategic plan for the Lower Valley Water District is dedicated to providing safe, efficient, and cost-effective potable water, sewer infrastructure, and solid waste services. Its core pillars include maximizing operational efficiency, meticulously managing infrastructure projects with environmental considerations, optimizing asset management through automation, fostering transparent communication with stakeholders, ensuring financial viability, and promoting employee development. The plan aims to achieve high customer satisfaction, protect future generations, and ensure the long-term sustainability and excellence of District operations.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lower Valley Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database