Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Loup City Airport Authority
Pavement Rehabilitation Including Panel Replacement, Re-Seal/Repair Concrete Joints, Spall Repair, and Pavement Marking on Runway 16/34, Connecting Taxiway, Turnarounds, Apron and Taxilanes. In general, this work will require the following quantities: Concrete Pavement Removal (413 SY); 6” Concrete Pavement (413 SY); Re-seal/Repair Concrete Joints (62,343 LF); Concrete Spall Repair (33 SF); Concrete Crack Repair (75 LF); Pavement Marking (20,329 SF).
Posted Date
Mar 10, 2026
Due Date
Apr 8, 2026
Release: Mar 10, 2026
Loup City Airport Authority
Close: Apr 8, 2026
Pavement Rehabilitation Including Panel Replacement, Re-Seal/Repair Concrete Joints, Spall Repair, and Pavement Marking on Runway 16/34, Connecting Taxiway, Turnarounds, Apron and Taxilanes. In general, this work will require the following quantities: Concrete Pavement Removal (413 SY); 6” Concrete Pavement (413 SY); Re-seal/Repair Concrete Joints (62,343 LF); Concrete Spall Repair (33 SF); Concrete Crack Repair (75 LF); Pavement Marking (20,329 SF).
AvailableLoup City Airport Authority
Work includes rehabilitate runway 16/34, taxiway, and apron pavement, acquire snow removal equipment, construct partial parallel taxiway to runway 34, construct hangar, construct partial parallel taxiway to runway.
Posted Date
Sep 24, 2025
Due Date
Oct 17, 2025
Release: Sep 24, 2025
Loup City Airport Authority
Close: Oct 17, 2025
Work includes rehabilitate runway 16/34, taxiway, and apron pavement, acquire snow removal equipment, construct partial parallel taxiway to runway 34, construct hangar, construct partial parallel taxiway to runway.
Loup City Airport Authority
Runway 4/22 grading (turf). In general, this work will require the following approximate quantities: installation & removal of silt fence (268 LF); installation & removal of wattle barrier (440 LF); embankment in place (2,855 CY); seeding, bonded fiber matrix, turf runway edge marker relocation.
Posted Date
Mar 26, 2025
Due Date
Apr 16, 2025
Release: Mar 26, 2025
Loup City Airport Authority
Close: Apr 16, 2025
Runway 4/22 grading (turf). In general, this work will require the following approximate quantities: installation & removal of silt fence (268 LF); installation & removal of wattle barrier (440 LF); embankment in place (2,855 CY); seeding, bonded fiber matrix, turf runway edge marker relocation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Loup City Airport Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database