Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
London-Laurel Co. Economic Development Authority
project consists of the construction of a new approximately 2,000 square foot administrative office building, including associated site work, utilities, and landscaping.
Posted Date
-
Due Date
Apr 23, 2026
London-Laurel Co. Economic Development Authority
Close: Apr 23, 2026
project consists of the construction of a new approximately 2,000 square foot administrative office building, including associated site work, utilities, and landscaping.
AvailableLondon-Laurel Co. Economic Development Authority
Construction of a 12,000 SF. speculative building on an existing concrete pad. construction of a 12,000 SF. pre-engineered metal building.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
London-Laurel Co. Economic Development Authority
Close: Dec 22, 2025
Construction of a 12,000 SF. speculative building on an existing concrete pad. construction of a 12,000 SF. pre-engineered metal building.
London-Laurel Co. Economic Development Authority
Project consists of tornado damage repairs to the exterior of the building that also includes 26-gauge exterior panels remove and replace where shown on the plans. Match color of existing; downspouts. Detach and reset or replace. Match existing color; exterior light fixture, detach and reset; 18" metal column cover with cap and base, remove and replace, match color of existing; roof replacement. See attached file.
Posted Date
Aug 13, 2025
Due Date
Aug 25, 2025
Release: Aug 13, 2025
London-Laurel Co. Economic Development Authority
Close: Aug 25, 2025
Project consists of tornado damage repairs to the exterior of the building that also includes 26-gauge exterior panels remove and replace where shown on the plans. Match color of existing; downspouts. Detach and reset or replace. Match existing color; exterior light fixture, detach and reset; 18" metal column cover with cap and base, remove and replace, match color of existing; roof replacement. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track London-Laurel Co. Economic Development Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database