LPRWS - Cottonwood Pipeline RFP
Posted
Nov 13, 2026
Dec 15, 2026
Constructing approx., 5 miles of 8"-12" pipeline, valves, crossings, and miscellaneous appurtenant items.
Track open bid opportunities, contracts, public meetings, and key contacts for Pipestone-Lincoln Rural Water District.
Active opportunities open for bidding
Posted
Nov 13, 2026
Dec 15, 2026
Constructing approx., 5 miles of 8"-12" pipeline, valves, crossings, and miscellaneous appurtenant items.
Posted
Nov 13, 2026
Dec 15, 2026
Project consists of test hole drilling, test well construction and capacity testing of test well, and the installation of pitless units, pumps, motors, and miscellaneous appurtenant items to finish two previously drilled production wells.
Posted
Nov 13, 2026
Dec 15, 2026
Construction of one booster pump station and three separate meter buildings including the foundations, structures, electrical work, process piping, site piping, and miscellaneous appurtenant work.
Posted
-
Dec 15, 2026
The project consists of constructing approximately 5 miles of 8”-12” pipeline, valves, crossings, and miscellaneous appurtenant items.
Posted
-
Dec 15, 2026
Construction of one booster pump station and three separate meter buildings including the foundations, structures, electrical work, process piping, site piping, and miscellaneous appurtenant work.
Posted
-
Dec 15, 2026
The project consists of test hole drilling, test well construction and capacity testing of test well, and the installation of pitless units, pumps, motors, and miscellaneous appurtenant items to finish two previously drilled production wells.
Posted
Nov 11, 2026
Dec 15, 2026
The project involves constructing a composite elevated storage tank in one of three capacities: 500,000, 600,000, or 750,000 gallons, together with a pedestal base building, process piping, pumps, MEP, site work, site piping, and related work. Bids are to be submitted to the Lincoln Pipestone Rural Water System office in Lake Benton by December 15, 2026, at 2:00 p.m. local time, when they will be publicly opened and read. Bidding documents can be viewed and ordered after registering with the issuing office through QuestCDN; digital downloads are available for $22 and printed documents cost $200.
Posted
Nov 11, 2026
Dec 15, 2026
The project involves constructing a composite elevated storage tank in one of three capacities: 500,000, 600,000, or 750,000 gallons, together with a pedestal base building, process piping, pumps, MEP, site work, site piping, and related work. Bids are to be submitted to the Lincoln Pipestone Rural Water System office in Lake Benton by December 15, 2026, at 2:00 p.m. local time, when they will be publicly opened and read. Bidding documents can be viewed and ordered after registering with the issuing office through QuestCDN; digital downloads are available for $22 and printed documents cost $200.
Key metrics and characteristics
City
The city where this buyer is located.
Lake Benton
County
The county where this buyer is located.
Lincoln
Address
Physical address of this buyer.
415 E Benton St. Po Box 188
Phone Number
Contact phone number for this buyer.
(507) 368-4248
Zip Code
Postal code for this buyer's location.
56149
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Procurement guidance and navigation tips.
These purchasing programs appear in Pipestone-Lincoln Rural Water District's records. Starbridge can help check which contracts cover your product.

Board meetings and strategic plans from Pipestone-Lincoln Rural Water District
This Strategic Plan serves as a roadmap to guide decisions, investments, and operations, ensuring reliable, high-quality water service for members. The plan reflects a commitment to continuous improvement, sustainability, and addressing the growing needs of the communities served. It outlines the organization's vision, mission, and values for the future.
This plan establishes a framework for preparing for and responding to droughts in Minnesota to minimize conflicts and negative impacts on the state's natural resources and economy. It outlines a staged approach to drought response, including non-drought, watch, warning, restrictive, and emergency phases, detailing specific actions for state and federal agencies, as well as water users and suppliers. The plan also defines the responsibilities of major participants such as the MN DNR, Metropolitan Council, U.S. Army Corps of Engineers, and local water entities, emphasizing coordination, monitoring, conservation, and emergency management.
Public-sector contacts connected to Pipestone-Lincoln Rural Water District.
Native sync to Salesforce & HubSpot
The strategic plan for Lincoln Pipestone Rural Water (LPRW) aims to provide clean, safe, and affordable water for every generation, serving as a roadmap to align investments, operations, and priorities for resilience and effectiveness. It is structured around five strategic pillars: ensuring uninterrupted, high-quality water services; strategic and sustainable fiscal management; engaging and educating the community; responsible use and stewardship of the natural environment; and achieving operational excellence. The plan's vision is to be a trusted public water system that sustains thriving families and a resilient local economy by reliably delivering clean, safe, and affordable water, with a mission focused on sustainability, innovation, and service excellence in meeting the water needs of rural Minnesota.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Pipestone-Lincoln Rural Water District meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership