Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Laporte County Regional Sewer District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Operator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Laporte County Regional Sewer District
Construction of pump station and sanitary force main; wastewater collection system. Construction of one (1) wastewater pump station and associated components such as generators, chemical feed systems, site work, electrical and instrumentation and flow meters. Installation of approx. 17,000 LF of 12" force main and associated components, such as flushing stations and air release valve stations. Construction of minor improvements at the District's Travel Plaza #3 Wastewater Treatment Plant facility, including the following: Construction of a new influent manual screen structure and removal of the existing comminutor structure. Addition of aeration to the existing surge tank to maintain solids suspension. Construction of two (2) submersible pumps and a control system to convey flows from Surge Tank to Selector Tank. Replacement of the RAS airlift pumps at the existing clarifiers. Contract B - Wastewater Collection System: Installation of approx. 37,000 LF of 1-1/4" through 4" pressure sewers and associated components, such as isolation valves, flushing stations, and air release valve stations. Installation of approx. 206 grinder pump stations and associated components such as grinder station control panels, curb stop check valve assemblies, electrical risers and electrical conduits/conductors.
Posted Date
Nov 13, 2024
Due Date
Mar 18, 2025
Release: Nov 13, 2024
Laporte County Regional Sewer District
Close: Mar 18, 2025
Construction of pump station and sanitary force main; wastewater collection system. Construction of one (1) wastewater pump station and associated components such as generators, chemical feed systems, site work, electrical and instrumentation and flow meters. Installation of approx. 17,000 LF of 12" force main and associated components, such as flushing stations and air release valve stations. Construction of minor improvements at the District's Travel Plaza #3 Wastewater Treatment Plant facility, including the following: Construction of a new influent manual screen structure and removal of the existing comminutor structure. Addition of aeration to the existing surge tank to maintain solids suspension. Construction of two (2) submersible pumps and a control system to convey flows from Surge Tank to Selector Tank. Replacement of the RAS airlift pumps at the existing clarifiers. Contract B - Wastewater Collection System: Installation of approx. 37,000 LF of 1-1/4" through 4" pressure sewers and associated components, such as isolation valves, flushing stations, and air release valve stations. Installation of approx. 206 grinder pump stations and associated components such as grinder station control panels, curb stop check valve assemblies, electrical risers and electrical conduits/conductors.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.