Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lakota Airport Authority
Work includes approx 200 LF of 1W-2" Sch. 80 HDPE directional bore; 50 LF of 4W-2" Sch. 80 HDPE directional bore; 14,800 LF of no. 8 AWG, 5kV, L-824. type C cable; 920 LF of no. 8 AWG, 600V type THWN-2; 10,600 LF of no 6 AWG, solid bare copper counterpoise wire; 460 LF of no. 6 AWG insulated stranded eqpt ground.
Posted Date
Apr 9, 2026
Due Date
Apr 30, 2026
Release: Apr 9, 2026
Lakota Airport Authority
Close: Apr 30, 2026
Work includes approx 200 LF of 1W-2" Sch. 80 HDPE directional bore; 50 LF of 4W-2" Sch. 80 HDPE directional bore; 14,800 LF of no. 8 AWG, 5kV, L-824. type C cable; 920 LF of no. 8 AWG, 600V type THWN-2; 10,600 LF of no 6 AWG, solid bare copper counterpoise wire; 460 LF of no. 6 AWG insulated stranded eqpt ground.
AvailableLakota Airport Authority
Project work consists of but is not limited to the following: Bid Schedule 1: Apron Reconstruction (AIP Eligible) will consist of pavement removal, pavement reclamation, excavation, grading, subgrade preparation, aggregate base construction, asphalt paving, pavement marking, seeding, and electrical construction. Bid Schedule 2: Apron Reconstruction (AIP Ineligible) will consist of pavement removal, subgrade preparation, aggregate base construction, and asphalt paving. Alternate #1: Taxiway A & B Mill & Overlay will consist of milling of asphalt pavement, asphalt paving, pavement marking, grading, and seeding. Alternate #2: West Taxilane Rehabilitation will consist of pavement reclamation, aggregate base construction, asphalt paving, pavement marking, grading, and seeding. Bid schedules 1 and 2 will be awarded with a combination of one, two or none of the alternate schedules. Construction for this project shall be completed by October 31, 2025, for all bid schedules.
Posted Date
Apr 7, 2025
Due Date
Apr 24, 2025
Release: Apr 7, 2025
Lakota Airport Authority
Close: Apr 24, 2025
Project work consists of but is not limited to the following: Bid Schedule 1: Apron Reconstruction (AIP Eligible) will consist of pavement removal, pavement reclamation, excavation, grading, subgrade preparation, aggregate base construction, asphalt paving, pavement marking, seeding, and electrical construction. Bid Schedule 2: Apron Reconstruction (AIP Ineligible) will consist of pavement removal, subgrade preparation, aggregate base construction, and asphalt paving. Alternate #1: Taxiway A & B Mill & Overlay will consist of milling of asphalt pavement, asphalt paving, pavement marking, grading, and seeding. Alternate #2: West Taxilane Rehabilitation will consist of pavement reclamation, aggregate base construction, asphalt paving, pavement marking, grading, and seeding. Bid schedules 1 and 2 will be awarded with a combination of one, two or none of the alternate schedules. Construction for this project shall be completed by October 31, 2025, for all bid schedules.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Lakota Airport Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database