Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lakewood Housing Authority
Removal and replacement of windows at building, a six-story residential building.
Posted Date
May 31, 2026
Due Date
Jun 22, 2026
Release: May 31, 2026
Lakewood Housing Authority
Close: Jun 22, 2026
Removal and replacement of windows at building, a six-story residential building.
AvailableLakewood Housing Authority
Project consists of but not limited to replacing two 3,150 MBTU/Hr input gas boilers, including, repipe boiler to existing piping circuit, rewire boiler to existing controls, repipe feed water to new boilers, repipe flue to existing chimney, line existing chimney, reconnect gas line- purge and leak check, insulate new piping to boilers, pipe/install boiler pumps to feed to building loop, and remove old boilers from site and discard. Work includes all construction trades, including, electrical and plumbing.
Posted Date
Mar 18, 2026
Due Date
Apr 17, 2026
Release: Mar 18, 2026
Lakewood Housing Authority
Close: Apr 17, 2026
Project consists of but not limited to replacing two 3,150 MBTU/Hr input gas boilers, including, repipe boiler to existing piping circuit, rewire boiler to existing controls, repipe feed water to new boilers, repipe flue to existing chimney, line existing chimney, reconnect gas line- purge and leak check, insulate new piping to boilers, pipe/install boiler pumps to feed to building loop, and remove old boilers from site and discard. Work includes all construction trades, including, electrical and plumbing.
Lakewood Housing Authority
Elevator service and maintenance. This specification provides for complete maintenance coverage including examinations, cleaning painting, lubrication, adjusting, parts replacements, repairs, and testing on all parts of the elevator equipment including but not limited to, machines, motors, motor starter, hydraulic power units, hydraulic power units, hydraulic pumps and valves, silencer, mufflers, controllers, selectors, relays, contractors, solid state devices, transformers resistors, and all related control equipment.
Posted Date
Mar 18, 2026
Due Date
Apr 23, 2026
Release: Mar 18, 2026
Lakewood Housing Authority
Close: Apr 23, 2026
Elevator service and maintenance. This specification provides for complete maintenance coverage including examinations, cleaning painting, lubrication, adjusting, parts replacements, repairs, and testing on all parts of the elevator equipment including but not limited to, machines, motors, motor starter, hydraulic power units, hydraulic power units, hydraulic pumps and valves, silencer, mufflers, controllers, selectors, relays, contractors, solid state devices, transformers resistors, and all related control equipment.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge