Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lake Pewaukee Sanitary District
Lift station support facility.
Posted Date
Feb 13, 2026
Due Date
Mar 3, 2026
Release: Feb 13, 2026
Lake Pewaukee Sanitary District
Close: Mar 3, 2026
Lift station support facility.
AvailableLake Pewaukee Sanitary District
Work includes approx 160 LF of silt fence; 1 ls horizontal directional boring; 104 SY topsoil, seed, fertilizer and mulch; 2,000 tn 6" asphaltic concrete binder course. 1 LS mobilization; 1 LS traffic control; 10 LF inlet protection, type d; 2,500 SY erosion matting; 7 ea ditch checks; 1 LS clearing and grubbing; 13,000 LF full-depth sawcutting; 1 LS horizontal directional drilling mobilization; 345 LF 18' force main horizontal directional drill installation (sta 11+00 to 14+45); 876 LF 16" force main w/ granular backfill (sta 14+45 to 23+21); 5,311 LF 16" force main w/ granular backfill (sta 23+21 to 76+32); 10 VF 72" sanitary sewer manhole; 7 EA locator boxes; 104 SY topsoil, seed, fertilizer and mulch; 2,600 tn 1-1/4" crushed aggregate base course. See attached file.
Posted Date
Mar 14, 2025
Due Date
Apr 17, 2025
Release: Mar 14, 2025
Lake Pewaukee Sanitary District
Close: Apr 17, 2025
Work includes approx 160 LF of silt fence; 1 ls horizontal directional boring; 104 SY topsoil, seed, fertilizer and mulch; 2,000 tn 6" asphaltic concrete binder course. 1 LS mobilization; 1 LS traffic control; 10 LF inlet protection, type d; 2,500 SY erosion matting; 7 ea ditch checks; 1 LS clearing and grubbing; 13,000 LF full-depth sawcutting; 1 LS horizontal directional drilling mobilization; 345 LF 18' force main horizontal directional drill installation (sta 11+00 to 14+45); 876 LF 16" force main w/ granular backfill (sta 14+45 to 23+21); 5,311 LF 16" force main w/ granular backfill (sta 23+21 to 76+32); 10 VF 72" sanitary sewer manhole; 7 EA locator boxes; 104 SY topsoil, seed, fertilizer and mulch; 2,600 tn 1-1/4" crushed aggregate base course. See attached file.
Lake Pewaukee Sanitary District
61,265 LF of 8" through 24" sanitary sewer cleaning and televising, 1,917 LF of 24" cured in place pipe, 8 spot liners, manhole grouting, spot joint test and seal grouting, bypass pumping, traffic control, tree removal, and other repairs.
Posted Date
Dec 12, 2024
Due Date
Jan 16, 2025
Release: Dec 12, 2024
Lake Pewaukee Sanitary District
Close: Jan 16, 2025
61,265 LF of 8" through 24" sanitary sewer cleaning and televising, 1,917 LF of 24" cured in place pipe, 8 spot liners, manhole grouting, spot joint test and seal grouting, bypass pumping, traffic control, tree removal, and other repairs.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lake Pewaukee Sanitary District
The meeting included a review and approval of the March financial statements and vouchers for both Lake and Sewer funds. New business involved presenting and discussing proposals from Ehlers and Trilogy Consulting, LLC regarding long-range financial plans, with requests made for comparative reports. Unfinished business focused on discussions concerning Impact Fees versus WWTC & Wetland Fees for new developments, the status of the Well #4 discharge agreement with the Village of Pewaukee, progress on Pump Stations PS #9, #12, and #14 upgrades, and an ongoing study by Ruekert Mielke to determine alternatives for Lift Station Upgrades at PS #6, #11, and #13 to accommodate future build-out.
The meeting included a presentation and discussion of preliminary drawings for the Sewer Building Expansion Project. The financial statements for March were presented and approved. The lake crew staff has been hired and the flat barge will be refurbished. Visu-Sewer is near completion of televising the contracted areas of the sewer system, and a quote for the next area to be televised was suggested. Soft starts on PS #14 were replaced and pumps at PS#7 are being replaced. Updates were provided on Lift Station Engineering Service Contracts for PS#2, PS#4, PS#1, and PS #10. The updated language for the Employee Procedures & Practices Section F. Disability Insurance with Northwestern Mutual was presented.
The Lake Pewaukee Sanitary District meeting included discussions on financial reports, a recommendation for annexation of Lot 3, and updates on various projects. These included the Orthopedic Association of Wisconsin, Woodridge Estates II, and the Lake Management Plan by SEWRPC. The board also discussed the Rue Study, an application for a grant for harvesters, and the lake cleanup contract with the City of Pewaukee. Additionally, there were updates on sewer and lake maintenance, including the replacement of electric power cords and batteries on generators, and the completion of bolts on the sea wall.
The Lake Pewaukee Sanitary District (LPSD) held a regular meeting where financial statements for December were presented and approved, highlighting cost variances affecting the budget. An offer to purchase land was presented for signatures, potentially for land acquisition. The manager reported on sewer and lake issues, including storm-related power outages and plans to build a new stainless steel front end for a shore barge unit. Discussions included updates on buildings at PS # 9, 12 & 14, responses to citizen concerns regarding the Thomas Farm development, Village of Pewaukee Well #4 discharge, lift station upgrades, and the Oak Street easement for sewer.
The meeting included discussion and possible action on the review of the Lake Management Plan by SEWRPC, the Lift Station Engineering Services Contract, the Pewaukee Lake Dam Order and lake levels, and a request to remove sewer from the center of a property and relocate it to the west property line. Additionally, there was discussion and possible action on sewer connection issues to Wilson's Island.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lake Pewaukee Sanitary District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lake Pewaukee Sanitary District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database