Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lake County Public Water District
Complete removal and disposal of existing membrane roofing system and insulation; removal, protection, and reinstallation of existing stainless steel metal coping and flashing; installation of new TPM (thermoplastic membrane) roofing system including insulation, membrane, and all associated flashings and penetration details; replacement of existing roof access ladder and roof access hatch; all necessary substrate preparation and repairs; and final cleanup and disposal of all debris and materials resulting from the work.
Posted Date
Jan 22, 2026
Due Date
Mar 3, 2026
Release: Jan 22, 2026
Lake County Public Water District
Close: Mar 3, 2026
Complete removal and disposal of existing membrane roofing system and insulation; removal, protection, and reinstallation of existing stainless steel metal coping and flashing; installation of new TPM (thermoplastic membrane) roofing system including insulation, membrane, and all associated flashings and penetration details; replacement of existing roof access ladder and roof access hatch; all necessary substrate preparation and repairs; and final cleanup and disposal of all debris and materials resulting from the work.
AvailableLake County Public Water District
Model year 2025 SUPER DUTY Ford F-250 XL 4x4 Pick-up Truck, or equivalent.
Posted Date
Mar 2, 2025
Due Date
Mar 11, 2025
Release: Mar 2, 2025
Lake County Public Water District
Close: Mar 11, 2025
Model year 2025 SUPER DUTY Ford F-250 XL 4x4 Pick-up Truck, or equivalent.
Lake County Public Water District
Construct an addition to the County Public Works Department Administration facility. Construction of this approx. 2,393 SF addition includes architecture, structural, civil, landscape, mechanical, electrical, plumbing, fire protection, low voltage infrastructure, and security systems. Trades Needed: Existing Conditions: Demo; Concrete Masonry; Metals; Woods, Plastics, and Composites Thermal and Moisture Protection; Openings; Finishes; Specialties- signage, wall and door protection, Toilet/bath accessories, fire protection; Furnishings - Roller window shades; Fire Suppression; Plumbing; HVAC; Electrical Electronic Safety and Security ;Special Provisions for site and Infrastructure; Earthwork; Exterior Improvements; Utilities.
Posted Date
Nov 14, 2024
Due Date
Dec 9, 2024
Release: Nov 14, 2024
Lake County Public Water District
Close: Dec 9, 2024
Construct an addition to the County Public Works Department Administration facility. Construction of this approx. 2,393 SF addition includes architecture, structural, civil, landscape, mechanical, electrical, plumbing, fire protection, low voltage infrastructure, and security systems. Trades Needed: Existing Conditions: Demo; Concrete Masonry; Metals; Woods, Plastics, and Composites Thermal and Moisture Protection; Openings; Finishes; Specialties- signage, wall and door protection, Toilet/bath accessories, fire protection; Furnishings - Roller window shades; Fire Suppression; Plumbing; HVAC; Electrical Electronic Safety and Security ;Special Provisions for site and Infrastructure; Earthwork; Exterior Improvements; Utilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lake County Public Water District
The Board of Trustees convened virtually to discuss several key items. The audit report was delayed, and a consent agenda was approved for minutes, treasurer's report, budget report, and MOS report. The board addressed an incorrect amount on the disbursements list for AARP Healthcare. The board also discussed a prevailing wage ordinance, generator replacement, filter underdrain replacement project, and repairs to the Low Lift Pump Station Revetment East Land Side. The board approved bidding documents for the Filter Underdrain Replacement and Main Plant and Low Lift Generator Replacement. The board also discussed and postponed the approval of the Revised Correll 404(c) Investment Advisory Services Agreement and discussed intake inspection updates and mutual aid.
The board discussed the nominations for the fiscal year 2025, facilities insurance renewal, modifying the personnel budget item, and reports for fiscal year 2024. The board also discussed the grant writing services, bid results for Low Lift Pump #2 Variable Frequency Drive (VFD) Replacement, End of Year Projections for availability & R&R charges, and update on Facilities Cost Estimate. In addition, the board discussed the Clark Dietz (CDI) Proposal for Consulting Engineer Services, Estimated Revenue Delivery Requirement and Estimated Water Rate for FY2025, Bond Principal & Interest Payment, Ground Storage Tank Stone, Approval of Concentric Support Services Agreement for FY 2025, Approval for Bidding Brickwork Tuckpointing at Low Lift Pump Station, and Approval of Revision to Sec. 501 Safety of the Employee Handbook.
The report discusses the financial statements of the Lake County Public Water District for the years ended April 30, 2019 and 2018. It includes an independent auditor's report, management's responsibility for the financial statements, and the auditor's responsibility. The report also covers opinions on the financial statements, required supplementary information, and other information related to revenue delivery requirement, availability charge, repair and replacement charges, and rate per thousand gallons for water delivery.
The board reviewed the annual audit report for the fiscal year ending April 30, 2011, including operations, demand for water, depreciation, personnel and pension costs, OPEB accrual, and rate calculation. They also discussed the plant upgrade project, the North West Lake Michigan Planning Group, Kellogg Creek project, Chlorine Scrubber, Second Raw Water Crossing Project, Intake Pipeline Project, North Solids Contact Unit, Plant Survey, Stainless Steel Rusting. The board also discussed Representative JoAnn Osmond's visit, roofing, raw water pump, replacement gate and new legislation.
The meeting included discussions on the Plant Upgrade to 6.5 mgdd Project, Chlorine Scrubber, Kellogg Creek, and Northwest Lake Michigan Planning Group. The board also discussed the Intake Pipeline Project, North Solids Contact Unit, Plant Survey, Windstorm damage, and Truck Bids. Additionally, there was a discussion regarding stainless steel rusting and right of way issues.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lake County Public Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lake County Public Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database