Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Kingdom East Unified Union School District
The Sutton School roof is a black EPDM adhered directly to the plywood decking. Perform an IR Survey during a sunny day before repairs are done to confirm the condition of the roof system as well as a visual inspection in the attic. All saturated plywood sections should be removed and replaced with dry plywood prior to coating of the roof. Repair all open conditions throughout the EPDM roof system as well as the perimeter. Once that is completed the seams should be re-enforced with seam sealer and the field of the roof should be coated with a silicone coating at a rate of 150 square feet per 1.5 gallons. Coat roof perimeter and seams with a silicone mastic at 70’ LF/per gallon. Caulk all drip edge and vents throughout the roof system
Posted Date
Mar 18, 2026
Due Date
Apr 10, 2026
Release: Mar 18, 2026
Kingdom East Unified Union School District
Close: Apr 10, 2026
The Sutton School roof is a black EPDM adhered directly to the plywood decking. Perform an IR Survey during a sunny day before repairs are done to confirm the condition of the roof system as well as a visual inspection in the attic. All saturated plywood sections should be removed and replaced with dry plywood prior to coating of the roof. Repair all open conditions throughout the EPDM roof system as well as the perimeter. Once that is completed the seams should be re-enforced with seam sealer and the field of the roof should be coated with a silicone coating at a rate of 150 square feet per 1.5 gallons. Coat roof perimeter and seams with a silicone mastic at 70’ LF/per gallon. Caulk all drip edge and vents throughout the roof system
AvailableKingdom East Unified Union School District
The Kingdom East Unified Union School District requests proposals to remove existing carpet, patch and prep concrete, and install vinyl plank hallway flooring at Lyndon Town School. The contractor must complete the work between June 22, 2026 and August 14, 2026, comply with OSHA and school requirements, and provide a certificate of insurance. A pre-bid/site visit is scheduled for 2026-03-26 and the solicitation closes on 2026-04-10.
Posted Date
Mar 18, 2026
Due Date
Apr 10, 2026
Release: Mar 18, 2026
Kingdom East Unified Union School District
Close: Apr 10, 2026
The Kingdom East Unified Union School District requests proposals to remove existing carpet, patch and prep concrete, and install vinyl plank hallway flooring at Lyndon Town School. The contractor must complete the work between June 22, 2026 and August 14, 2026, comply with OSHA and school requirements, and provide a certificate of insurance. A pre-bid/site visit is scheduled for 2026-03-26 and the solicitation closes on 2026-04-10.
AvailableKingdom East Unified Union School District
Kingdom East Unified Union School District is soliciting proposals from qualified contractors to remove wallpaper, prepare and repair walls, and paint hallways at Lyndon Town School. Contractors must adhere to specific insurance requirements, including a minimum of $1,000,000 in General Liability insurance and workers' compensation coverage. Bids must be submitted by appointment, mail, or email according to the RFP instructions for public opening or district handling.
Posted Date
Mar 16, 2026
Due Date
Apr 10, 2026
Release: Mar 16, 2026
Kingdom East Unified Union School District
Close: Apr 10, 2026
Kingdom East Unified Union School District is soliciting proposals from qualified contractors to remove wallpaper, prepare and repair walls, and paint hallways at Lyndon Town School. Contractors must adhere to specific insurance requirements, including a minimum of $1,000,000 in General Liability insurance and workers' compensation coverage. Bids must be submitted by appointment, mail, or email according to the RFP instructions for public opening or district handling.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Kingdom East Unified Union School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database