Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
King County Water District 19
Install new 12" water main and new 8" water main. Work also includes installation of a new pressure reducing valve station includes 5,250 LF 8" DI water pipe incl. fittings, 1,090 LF 12" DI water pipe incl. fittings.
Posted Date
Sep 20, 2024
Due Date
Jul 1, 2025
Release: Sep 20, 2024
King County Water District 19
Close: Jul 1, 2025
Install new 12" water main and new 8" water main. Work also includes installation of a new pressure reducing valve station includes 5,250 LF 8" DI water pipe incl. fittings, 1,090 LF 12" DI water pipe incl. fittings.
King County Water District 19
Install approx. 15,500 LF water main (4", 6", and 8") along multiple public roads by trenching and earthwork, erosion control, PVC water mains, service laterals, fire hydrants, fittings, two precast concrete vaults, crushed rock and native soil backfill, HMA patching of shoulder cuts and transverse crossings, and traffic control.
Posted Date
Mar 30, 2026
Due Date
May 4, 2026
Release: Mar 30, 2026
King County Water District 19
Close: May 4, 2026
Install approx. 15,500 LF water main (4", 6", and 8") along multiple public roads by trenching and earthwork, erosion control, PVC water mains, service laterals, fire hydrants, fittings, two precast concrete vaults, crushed rock and native soil backfill, HMA patching of shoulder cuts and transverse crossings, and traffic control.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from King County Water District 19
The 2007 Water System Plan for Water District 19 provides a long-range planning document to assess the adequacy of its water system and meet future needs on Vashon Island. It addresses regulatory concerns, identifies existing system characteristics, and outlines strategies for water conservation, resource protection, operations, maintenance, and capital improvements. The plan also details financial alternatives to implement these recommendations within a twenty-year planning horizon.
This document outlines Section 2, 'Basic Planning Data,' of Water District 19's Comprehensive Plan. It provides an overview of the District's service area, including physical and demographic characteristics, land use, and water consumption trends. The plan analyzes past and projected population, employment, and water demands, with a focus on addressing the existing moratorium on new connections due to capacity limitations. It evaluates the system's ability to meet the needs of current and future residents, presenting projected water demands both with and without conservation strategies. This section serves as foundational data for future land use planning and potential revisions to the Vashon Town Plan in collaboration with King County and the Vashon community.
This section of the Comprehensive Plan for Water District 19 provides a detailed analysis of the existing water system and outlines recommendations for its future maintenance and improvement through 2030. The primary focus is on evaluating and ensuring adequate supply and storage capacity, optimizing pumping facilities, and enhancing the distribution network to meet anticipated population growth and demand. Key strategic areas include source production and reliability, managing various storage requirements (operational, standby, fire suppression), improving pumping efficiency, and upgrading the distribution system based on comprehensive hydraulic modeling to address pressure and fire flow deficiencies.
This document represents King County Water District No. 19's comprehensive planning effort, updating and superseding its 2000 Plan to comply with Washington State Law requiring water system plan updates every six years. The plan outlines policies for providing clean, safe drinking water, maintaining infrastructure, and ensuring long-term sustainability of water sources. Key areas include conservative planning for new connections, environmental stewardship, water conservation through educational outreach and leak detection, and adherence to high water quality standards. It details existing system characteristics, design criteria, identifies deficiencies, and presents a capital facilities plan and implementation program.
This document outlines the financing and implementation strategies for a water utility's Comprehensive Plan, detailing financial considerations, diverse funding sources, and capital improvement financing methods. It addresses managing operational expenses, securing funds through rates, connection charges, various loans, and grants, and structuring financing for general, local, and private facilities. The plan is designed to ensure the long-term financial viability of the water system and support future development, advocating for ongoing rate analyses and strategic funding approaches.
Extracted from official board minutes, strategic plans, and video transcripts.
Track King County Water District 19's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database