Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Kickapoo Tribe in Kansas
Construction of approximately 1.5" miles of grading and surfacing (2" asphalt) with pipe structures. Work includes clearing and grubbing; common excavation; compaction of earthwork; corrugated metal“pipe and end section installation; AB-3 surfacing material; 2" HMA commercial grade surfacing;“milling; pavement markings; temporary erosion and pollution control; permanent seeding; and traffic“control in accordance with MUTCD and the project plans.
Posted Date
Feb 12, 2026
Due Date
Mar 4, 2026
Release: Feb 12, 2026
Kickapoo Tribe in Kansas
Close: Mar 4, 2026
Construction of approximately 1.5" miles of grading and surfacing (2" asphalt) with pipe structures. Work includes clearing and grubbing; common excavation; compaction of earthwork; corrugated metal“pipe and end section installation; AB-3 surfacing material; 2" HMA commercial grade surfacing;“milling; pavement markings; temporary erosion and pollution control; permanent seeding; and traffic“control in accordance with MUTCD and the project plans.
AvailableKickapoo Tribe in Kansas
Furnish and install 1,200 LF of 4' welded wire fencing with 3-line barbed wire at the top. Furnish and install two (2) 4' x 12' access gates. Repair 100 LF of 4' fencing by replacing in kind. Clear, grub and smooth ground for area where fence is to be installed. Attach both ends of installed fencing to existing fencing. Provide topsoiling, seeding fertilization and mulching for disturbed areas to establish grass cover to prevent erosion.
Posted Date
Aug 14, 2025
Due Date
Aug 29, 2025
Release: Aug 14, 2025
Kickapoo Tribe in Kansas
Close: Aug 29, 2025
Furnish and install 1,200 LF of 4' welded wire fencing with 3-line barbed wire at the top. Furnish and install two (2) 4' x 12' access gates. Repair 100 LF of 4' fencing by replacing in kind. Clear, grub and smooth ground for area where fence is to be installed. Attach both ends of installed fencing to existing fencing. Provide topsoiling, seeding fertilization and mulching for disturbed areas to establish grass cover to prevent erosion.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Kickapoo Tribe in Kansas's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Kickapoo Tribe in Kansas's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database