Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Keystone Service Systems, Inc. DBA Capital Area Head Start
Remodeling of 3 single-story houses. Project consists of remodeling 3 existing single-story houses in the area in order to make them compliant with ADA design standards along with exterior improvements, new lighting, HVAC and finishes. 1. The scope of work at Warren Ave includes adding an accessible ramp at the front entrance, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, regrading the existing driveway, sidewalk leveling, new lighting and power, and new finishes. 2. The scope of work includes adding a new concrete front porch with an ADA accessible ramp, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, new accessible outdoor deck with a ramp, new lighting and power, relocating the electrical meter box, and new finishes.3. The scope of work at Stucker Ave includes adding a new concrete accessible ramp at the front and side entrances, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, new HVAC system, reconfiguring the existing kitchen, new lighting and power, new vinyl siding, new windows, and new finishes.
Posted Date
May 13, 2026
Due Date
Jun 16, 2026
Release: May 13, 2026
Keystone Service Systems, Inc. DBA Capital Area Head Start
Close: Jun 16, 2026
Remodeling of 3 single-story houses. Project consists of remodeling 3 existing single-story houses in the area in order to make them compliant with ADA design standards along with exterior improvements, new lighting, HVAC and finishes. 1. The scope of work at Warren Ave includes adding an accessible ramp at the front entrance, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, regrading the existing driveway, sidewalk leveling, new lighting and power, and new finishes. 2. The scope of work includes adding a new concrete front porch with an ADA accessible ramp, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, new accessible outdoor deck with a ramp, new lighting and power, relocating the electrical meter box, and new finishes.3. The scope of work at Stucker Ave includes adding a new concrete accessible ramp at the front and side entrances, reconfiguring the bathrooms to make them ADA compliant, new plumbing fixtures, new HVAC system, reconfiguring the existing kitchen, new lighting and power, new vinyl siding, new windows, and new finishes.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge