Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Jefferson Water And Sewer District
The project includes: 58,672 LF 8" light to heavy cleaning; 8" CCTV inspection; 3,191 LF 10" light to heavy cleaning; 10" CCTV inspection; 1,921 LF 12" light to heavy cleaning; 12" CCTV inspection; 8,048 LF 15" light to heavy cleaning; 15" CCTV inspection; 1,900 LF 18" light to heavy cleaning; 18" CCTV inspection.
Posted Date
-
Due Date
Apr 1, 2025
Jefferson Water And Sewer District
Close: Apr 1, 2025
The project includes: 58,672 LF 8" light to heavy cleaning; 8" CCTV inspection; 3,191 LF 10" light to heavy cleaning; 10" CCTV inspection; 1,921 LF 12" light to heavy cleaning; 12" CCTV inspection; 8,048 LF 15" light to heavy cleaning; 15" CCTV inspection; 1,900 LF 18" light to heavy cleaning; 18" CCTV inspection.
Jefferson Water And Sewer District
Work includes approximate linear footage 8" light to heavy cleaning 138 32,953 LF 8" cctv inspection 138 10" light to heavy cleaning 122 27,191 LF 10" cctv inspection 122 12" light to heavy cleaning 5 561 LF 12" cctv inspection 5 15" light to heavy cleaning 14 3,578 LF 15" cctv inspection 14 18" light to heavy cleaning 17 5,473 LF.
Posted Date
Apr 1, 2026
Due Date
May 8, 2026
Release: Apr 1, 2026
Jefferson Water And Sewer District
Close: May 8, 2026
Work includes approximate linear footage 8" light to heavy cleaning 138 32,953 LF 8" cctv inspection 138 10" light to heavy cleaning 122 27,191 LF 10" cctv inspection 122 12" light to heavy cleaning 5 561 LF 12" cctv inspection 5 15" light to heavy cleaning 14 3,578 LF 15" cctv inspection 14 18" light to heavy cleaning 17 5,473 LF.
AvailableJefferson Water And Sewer District
Pressure reducing valve and concrete vault complete waterline and appurtenances; electrical and SCADA integration; existing booster station removal and delivery.
Posted Date
Jan 19, 2026
Due Date
Feb 2, 2026
Release: Jan 19, 2026
Jefferson Water And Sewer District
Close: Feb 2, 2026
Pressure reducing valve and concrete vault complete waterline and appurtenances; electrical and SCADA integration; existing booster station removal and delivery.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Jefferson Water And Sewer District
The document comprises a resolution by the Jefferson Water and Sewer District Board of Trustees authorizing two agreements with Taylor Industrial Park, LLC: a Water Tap Agreement and a Sanitary Sewer Tap Agreement. The Water Tap Agreement covers the sale of two water Taps, including fire lines and meters, for commercial buildings at a total fee of $127,177.26. The Sanitary Sewer Tap Agreement covers the sale of two sewer Taps, including City of Columbus Taps and a Supplemental Capacity Fee, with a total of $75,983.00. Both agreements detail payment terms, on-site/off-site improvements, purchase of additional taps, minimum fees, termination clauses, and facilities conveyance, along with standard contract clauses.
Effective Date
Oct 20, 2022
Expires
Effective: Oct 20, 2022
Jefferson Water And Sewer District
Expires:
The document comprises a resolution by the Jefferson Water and Sewer District Board of Trustees authorizing two agreements with Taylor Industrial Park, LLC: a Water Tap Agreement and a Sanitary Sewer Tap Agreement. The Water Tap Agreement covers the sale of two water Taps, including fire lines and meters, for commercial buildings at a total fee of $127,177.26. The Sanitary Sewer Tap Agreement covers the sale of two sewer Taps, including City of Columbus Taps and a Supplemental Capacity Fee, with a total of $75,983.00. Both agreements detail payment terms, on-site/off-site improvements, purchase of additional taps, minimum fees, termination clauses, and facilities conveyance, along with standard contract clauses.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Jefferson Water And Sewer District
The discussion focused on the operational procedures and challenges related to the redwater project, specifically concerning the five iron filters used to remove iron and manganese from the water. A speaker detailed the current practice of backwashing these filters sequentially between 2:30 PM and midnight to allow the resulting backwash water (sent to the redwater tank) eight hours to settle before being sent to the golf course. This timed approach deviates from the manufacturer's recommendation based on pressure gauge readings, potentially damaging the filter media, which was recently replaced at a significant cost. The original plant expansion plans included a second redwater tank and two additional sand filters to allow for proper settling time while maintaining operational flow, which is no longer being considered in the current, scaled-down improvement plans. The speaker is reviewing golf course contracts and intends to revert to manufacturer-recommended backwash procedures, which might temporarily affect the frequency of irrigation for the golf course until a solution, such as installing a second tank, is implemented and evaluated for return on investment. Additionally, the board was updated on efforts to evaluate potential new water sources in the area, with an analysis pending from geologists.
The Board of Trustees of the Jefferson Water and Sewer District convened in a regular session. The primary action involved the approval of a resolution authorizing the District to contract and pay for a repair to a private water service line located at 8084 Ramseys Crossing Drive. The repair cost is set at $2,500.00, to be amortized over 12 months and added as monthly payments to the residents' water bill. The Board confirmed that all formal actions related to this resolution were conducted in open meetings in compliance with Ohio Revised Code requirements.
The Board of Trustees meeting included authorizing a contract with Arcadis US, Inc. for the development of a Water System Master Plan, not to exceed $62,600. The Board convened an executive session regarding confidential negotiations related to economic development assistance and public infrastructure improvements. The authorized strength for the Operator-in-Training position was amended to increase the pay grade and range to attract more candidates. An update was provided on the Iron Filter #1 underdrain repair and media replacement. The Board authorized the execution of Amendment No. 2 to water and sewer tap agreements for Courtyards at Morse Circle South, and approved the Water Tap Agreement and Sewer Tap Agreement for Woodland Preserve. Approval was also granted to accept OWDA funding for the Water Treatment Plant Sanitary Sewer Lift Station Project. The Board reviewed the June 2023 Financial Report, discussed a CD reinvestment update, and noted the 2022 Audit was underway. Furthermore, the Board approved declaring certain equipment surplus for disposal through various means and approved the Accounts Payable bills for June 2023. Following a second executive session concerning public employee compensation, the Board approved a one-time Pay for Performance Award to the Director.
The regular meeting of the Board of Trustees covered several key administrative and operational items. Discussions included the reinstatement of the maintenance agreement for the Havens & McOwen Water Towers with Utility Service Co., Inc., and the presentation and adoption of the Employee Cost Savings Incentive Plan designed to reward efficiency ideas. Updates were provided on ongoing fire hydrant painting efforts and positive overtime expense tracking. The Attorney reported on ratifying the Director's authority to execute a grant agreement with the Ohio Department of Development for a $2.95 million Ohio BUILDS Water Infrastructure Grant, and provided an update on a watermain damage claim against a contractor's insurance carrier. The Controller reported on the completion of the 2022 Audit without exceptions, noting planned evaluations for the upcoming liability insurance renewal, and provided details on the July 2023 Financial Report, which showed lower water usage due to favorable weather. The Project Manager reported that the WTP Lift Station Improvement Project is nearing completion, with new pumps pending installation. The Office Manager reported that meter installations are on hold due to staffing, and usage reconciliation data from external sources was pending for the July report.
Key discussions during the meeting centered on crucial infrastructure and operational improvements. A primary focus was justifying the need for a new firehouse, detailing current high call volumes (averaging 70 runs daily) and poor response times in specific areas, including jurisdictional boundaries and transport issues. The board reviewed proposed locations for the new facility, noting issues with one potential site near a park due to neighborhood opposition and bureaucratic hurdles. Funding discussions involved authorization for a contract not to exceed $196,000 for replacing pumps at Roosevelt Field to increase pumping capacity to 9 million gallons per minute. Plant efficiencies were discussed, including reprogramming the system to run two transfer pumps simultaneously. Another significant topic involved capital improvements for the sanitary sewer system. This included authorizing contracts totaling approximately $73,000 for purchasing and installing generators, transfer switches, and control panels at various lift stations, many of which have outdated panels over 20 years old. The board is also initiating a comprehensive evaluation of the entire sanitary sewer system via an RFQ for an engineering firm, aiming to optimize flow and determine necessary improvements for the 2023 budget. Furthermore, action was required regarding manhole rehabilitation projects, authorizing a contract of $48,000 to line seven specific manholes identified on drawings, utilizing a material guaranteed for 10 years. Finally, an amendment to the employee handbook was discussed to define employment statuses (full-time regular, part-time, and seasonal) to facilitate the hiring of seasonal employees for hydrant painting and inspections.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Jefferson Water And Sewer District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database