Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Jackson Township Authority
Demolition and removal of an existing 42" CMP culvert pipe and concrete endwall, the installation of a new 48" SLCPP culvert pipe and associated precast concrete endwalls in place, minor grading as part of culvert installation, placement of riprap and scour protection, restoration of the roadway, and all other associated work.
Posted Date
Jun 8, 2026
Due Date
Jul 3, 2026
Release: Jun 8, 2026
Jackson Township Authority
Close: Jul 3, 2026
Demolition and removal of an existing 42" CMP culvert pipe and concrete endwall, the installation of a new 48" SLCPP culvert pipe and associated precast concrete endwalls in place, minor grading as part of culvert installation, placement of riprap and scour protection, restoration of the roadway, and all other associated work.
AvailableJackson Township Authority
Sports courts and related improvements. The project includes, but is not limited to, the removal of trees and brush, the construction of pickleball and basketball courts, including associated grading, subbase, paving, and acrylic surfacing application, the procurement and installation of equipment and outer PVC-coated chain link fencing, the construction and associated grading of a paved 6”-wide ADA path to the sports courts from an existing parking lot, the overlay of an existing 10’-wide stone walking path, tree planting, and all other associated work.
Posted Date
Apr 2, 2026
Due Date
May 1, 2026
Release: Apr 2, 2026
Jackson Township Authority
Close: May 1, 2026
Sports courts and related improvements. The project includes, but is not limited to, the removal of trees and brush, the construction of pickleball and basketball courts, including associated grading, subbase, paving, and acrylic surfacing application, the procurement and installation of equipment and outer PVC-coated chain link fencing, the construction and associated grading of a paved 6”-wide ADA path to the sports courts from an existing parking lot, the overlay of an existing 10’-wide stone walking path, tree planting, and all other associated work.
Jackson Township Authority
Work generally includes double bituminous seal coats (oil & chip) along Lengle Road and a section of Elm Street. Oil and chip work includes two coats of asphalt seal coat, with the second coat applied immediately atop the first. The first coat is to be done with 1/2" clean stone, with the second coat to be with 1/4" clean stone. Work also includes the application of a single bituminous seal coat along Flanagan Road.
Posted Date
Mar 6, 2026
Due Date
Apr 3, 2026
Release: Mar 6, 2026
Jackson Township Authority
Close: Apr 3, 2026
Work generally includes double bituminous seal coats (oil & chip) along Lengle Road and a section of Elm Street. Oil and chip work includes two coats of asphalt seal coat, with the second coat applied immediately atop the first. The first coat is to be done with 1/2" clean stone, with the second coat to be with 1/4" clean stone. Work also includes the application of a single bituminous seal coat along Flanagan Road.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge