Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Hopi Utilities Corporation
Construction of approx., 3,000 LF of 6" distribution piping from booster pump station #2, west along highway 264. Installation of a pressure sustaining valve in manhole on the inlet pipe to keams tank 2. Reconnection of customer service lines, some with individual pressure reducing valves in boxes. Connection to existing piping.
Posted Date
May 22, 2026
Due Date
Jul 3, 2026
Release: May 22, 2026
Hopi Utilities Corporation
Close: Jul 3, 2026
Construction of approx., 3,000 LF of 6" distribution piping from booster pump station #2, west along highway 264. Installation of a pressure sustaining valve in manhole on the inlet pipe to keams tank 2. Reconnection of customer service lines, some with individual pressure reducing valves in boxes. Connection to existing piping.
AvailableHopi Utilities Corporation
Construction of approx. 2,050 linear feet (LF) of new 8" HDPE water transmission line, connection to the HAMP water system, connection to the Shungopavi tank site piping, valves, and appurtenances, and inspection of the existing 250,000-gallon elevated tank.
Posted Date
Apr 2, 2026
Due Date
May 22, 2026
Release: Apr 2, 2026
Hopi Utilities Corporation
Close: May 22, 2026
Construction of approx. 2,050 linear feet (LF) of new 8" HDPE water transmission line, connection to the HAMP water system, connection to the Shungopavi tank site piping, valves, and appurtenances, and inspection of the existing 250,000-gallon elevated tank.
Hopi Utilities Corporation
Construction of approx. 900 LF of new 8" PVC waterline, altitude valve vault, two connections to the existing 8" waterline, gate valves and appurtenances.
Posted Date
Aug 22, 2025
Due Date
Sep 29, 2025
Release: Aug 22, 2025
Hopi Utilities Corporation
Close: Sep 29, 2025
Construction of approx. 900 LF of new 8" PVC waterline, altitude valve vault, two connections to the existing 8" waterline, gate valves and appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge