M-40 Lift Station Improvements RFP
Posted
Oct 23, 2026
Nov 19, 2026
The project includes the demolition of the existing lift station and construction of a submersible duplex lift station. Demolition includes removal of existing equipment and removal/abandonment of the wet well and dry well. Proposed work includes construction of a wet well, valve chamber, meter chamber, reconnecting to the existing gravity sewer and force main, control panel, natural gas generator, and cleaning, televising, and lining of the existing force main with flexible fabric-reinforced pipe (ffrp). Surface work includes restoration of the surrounding area. Bid alternates include cured-in-place pipe (cipp) lining of the force main instead of ffrp, interior coating of the wet well


