Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ho-Chunk Nation Transportation Authority
Work includes approx. 3,969 CY of excavation; 2 EA of 15" apron endwalls for culvert pipe; 12 CY of riprap medium; 20,348 LF of 4" Marking line epoxy; 316 LF of sawing asphalt; 1,318 LF of 24" concrete curb and gutter; topsoil, seed, fertilizer & mulch.
Posted Date
Apr 27, 2026
Due Date
May 18, 2026
Release: Apr 27, 2026
Ho-Chunk Nation Transportation Authority
Close: May 18, 2026
Work includes approx. 3,969 CY of excavation; 2 EA of 15" apron endwalls for culvert pipe; 12 CY of riprap medium; 20,348 LF of 4" Marking line epoxy; 316 LF of sawing asphalt; 1,318 LF of 24" concrete curb and gutter; topsoil, seed, fertilizer & mulch.
AvailableHo-Chunk Nation Transportation Authority
Work includes approx 1,018 tn 1-1/4" base aggregate dense; 108 LF of 12" culvert pipe reinforced concrete class iv; 132 LF of sawing asphalt; 1 ls erosion control. Work also includes 1,692 SY of removing asphaltic pavement; 65 CY of excavation common; 1,018 ton of base aggregate dense 1 1/4"; 10 CY of borrow; 472 ton of hma pavement 4 lt 58-34 s; 108 LF of culvert pipe reinforced concrete class iv 12"; 459 LF of marking diagonal paint 6"; 422 LF of marking parking stall paint; 132 LF of sawing asphalt. See outside link.
Posted Date
Jan 21, 2026
Due Date
Feb 24, 2026
Release: Jan 21, 2026
Ho-Chunk Nation Transportation Authority
Close: Feb 24, 2026
Work includes approx 1,018 tn 1-1/4" base aggregate dense; 108 LF of 12" culvert pipe reinforced concrete class iv; 132 LF of sawing asphalt; 1 ls erosion control. Work also includes 1,692 SY of removing asphaltic pavement; 65 CY of excavation common; 1,018 ton of base aggregate dense 1 1/4"; 10 CY of borrow; 472 ton of hma pavement 4 lt 58-34 s; 108 LF of culvert pipe reinforced concrete class iv 12"; 459 LF of marking diagonal paint 6"; 422 LF of marking parking stall paint; 132 LF of sawing asphalt. See outside link.
Ho-Chunk Nation Transportation Authority
Major Quantities for the Work Include; 1,700 SY Remove Existing Pavement; 581 CY Common Excavation (P); 426 CY Crushed Aggregate Base Course; 201 TON HMA Asphalt Pavement, 3 MT 58-28 S; 201 TON HMA Asphalt Pavement, 4 MT 58-34 S; 176 SF 6-inch Concrete Walk; 145 LF Concrete Curb and Gutter, 18-inch, Reject; 605 SY Lawn Restoration; 23 EACH Landscape Plantings (Shrubs); 58 SY Landscaping Bed; 1 LS Rain Garden Bed and Plantings.
Posted Date
May 20, 2025
Due Date
Jun 3, 2025
Release: May 20, 2025
Ho-Chunk Nation Transportation Authority
Close: Jun 3, 2025
Major Quantities for the Work Include; 1,700 SY Remove Existing Pavement; 581 CY Common Excavation (P); 426 CY Crushed Aggregate Base Course; 201 TON HMA Asphalt Pavement, 3 MT 58-28 S; 201 TON HMA Asphalt Pavement, 4 MT 58-34 S; 176 SF 6-inch Concrete Walk; 145 LF Concrete Curb and Gutter, 18-inch, Reject; 605 SY Lawn Restoration; 23 EACH Landscape Plantings (Shrubs); 58 SY Landscaping Bed; 1 LS Rain Garden Bed and Plantings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Ho-Chunk Nation Transportation Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database