Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Heart Of Iowa Regional Transit Agency
Reconstruct water main. Contractor shall furnish all labor, materials and equipment required for installing 1,270 Linear Feet (LF) of 8” PVC (trenched), with associated valves, hydrants, fittings, and service lines as outlined in the bid documents. This includes removal and replacement of sidewalk, driveways, and concrete pavement; erosion control, traffic control, utility exploration, finish grading, sod placement, and other miscellaneous items described in the bid documents. All work and materials shall comply with the proposed plans, specifications, and proposed form of contract now on file with the General Manager. Said documents are by reference made a part hereof, as though fully set out and incorporated herein.
Posted Date
Mar 12, 2025
Due Date
Apr 3, 2025
Release: Mar 12, 2025
Heart Of Iowa Regional Transit Agency
Close: Apr 3, 2025
Reconstruct water main. Contractor shall furnish all labor, materials and equipment required for installing 1,270 Linear Feet (LF) of 8” PVC (trenched), with associated valves, hydrants, fittings, and service lines as outlined in the bid documents. This includes removal and replacement of sidewalk, driveways, and concrete pavement; erosion control, traffic control, utility exploration, finish grading, sod placement, and other miscellaneous items described in the bid documents. All work and materials shall comply with the proposed plans, specifications, and proposed form of contract now on file with the General Manager. Said documents are by reference made a part hereof, as though fully set out and incorporated herein.
Heart Of Iowa Regional Transit Agency
Works include approx. 1,050 LF 8" Water Main; 7 EA 1" Copper Water Service Connection, Short-side; 2 EA 4" Water Main Abandonment, Cap; 535 SY 4" Sidewalk, PCC; 970 LF Filter Sock.
Posted Date
Mar 11, 2026
Due Date
Apr 8, 2026
Release: Mar 11, 2026
Heart Of Iowa Regional Transit Agency
Close: Apr 8, 2026
Works include approx. 1,050 LF 8" Water Main; 7 EA 1" Copper Water Service Connection, Short-side; 2 EA 4" Water Main Abandonment, Cap; 535 SY 4" Sidewalk, PCC; 970 LF Filter Sock.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Heart Of Iowa Regional Transit Agency
The meeting included discussion and approval of various action items, including an attorney engagement letter, the Complete Trip - ITS4US Deployment Program contracts, amended contract extensions, and an amended FY2021 budget. The board also received reports from the HIRTA Executive Director and CIRTPA, and discussed informational items.
The meeting agenda includes a public hearing for the HIRTA Facility Title VI Equity Analysis, with a subsequent public comment period. Action items for consideration include the approval of an Amoco Loan Agreement with Iowa DOT to cover matching funds for six minivans, the approval of three separate Bus Contracts (#1168, #2032, and #7548 for shortfall funds), consideration for opening a checking account for Heart of Transit, and approval for moving invoice payments to ACH, while reserving checks only for those without an ACH option. The board will also consider approval of the Waiting List Policy for Aging Resources. Discussion items include the FY2027 Budget.
The meeting began with a public hearing concerning the HIRTA Facility Title VI Equity Analysis, which was subsequently approved. Following this, the Heart of Transit Annual Meeting was held, during which the 2025 Annual Financial Report was received and filed. Action items included the approval of the Indianola Lease Agreement, revisions to the Employee Handbook Policy concerning Tobacco, Meals, FMLA, PTO, and Floating Holidays, approval of the Cyber Security Plan, and the approval of MPO Resolution and Representatives for 2026. Discussion items and reports from the Regional Planning Agency Director and the Chief Executive Officer were also presented.
The Board Meeting agenda includes calling the meeting to order, roll call, public comment, and financial report reception and filing covering September through December 2025 journal entries. Key action items involve considering approval for the ISU AWD-026186 Agreement Extension 3, acknowledging an Investment CD Rollover, acknowledging Vehicle Disposals, and considering approval for the Health Connector Agreement Amendment 3. Reports are scheduled from the CIRTPA Regional Planning Agency Director and the HIRTA CEO.
The meeting commenced with the approval of the agenda. Key actions included receiving and filing September, October, and November 2025 financial reports and journal entries. The board unanimously approved several action items: the extension of the ISU AWD-026186 Agreement (3), the Acknowledgement of Investment CD Rollover, the Acknowledgement of Vehicle Disposals, and the Health Connector Agreement Amendment (3). The meeting concluded with reports from the Regional Planning Agency Director and the Chief Executive Officer.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Heart Of Iowa Regional Transit Agency's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database