Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $90,000, use sole source (low-probability path here; steer the conversation back to coops).
Coops: Lead with TIPS-USA or BuyBoard. Build support with the relevant department head, then coordinate with finance to buy via the coop and avoid a formal RFP.
Sole Source
Entity: Haywood County School District, TN
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Haywood High School's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Haywood High School
Provide construction management services for county schools greenhouse project.
Posted Date
Jan 14, 2026
Due Date
Jan 22, 2026
Release: Jan 14, 2026
Haywood High School
Close: Jan 22, 2026
Provide construction management services for county schools greenhouse project.
AvailableHaywood High School
Three (3) Trane 5 ton Gas Package Unit to include: Remove old package system. Install new 14 SEER Trane package unit with gas heat. New reinforced equipment pad, new T701 thermostat, and internal filter racks. Install new custom supply and return duct work up the exterior wall of the transportation bus garage, and flashing. Install new supply diffuser. Install new high voltage electrical wiring and conduit from breaker box for each system. Install new gas line for each system and leak check. Standard Equipment warranty to include 5-year parts, 1 year labor, 20-year Heat Exchanger and 10-year workmanship warranty on gas line.
Posted Date
Oct 22, 2025
Due Date
Oct 31, 2025
Release: Oct 22, 2025
Haywood High School
Close: Oct 31, 2025
Three (3) Trane 5 ton Gas Package Unit to include: Remove old package system. Install new 14 SEER Trane package unit with gas heat. New reinforced equipment pad, new T701 thermostat, and internal filter racks. Install new custom supply and return duct work up the exterior wall of the transportation bus garage, and flashing. Install new supply diffuser. Install new high voltage electrical wiring and conduit from breaker box for each system. Install new gas line for each system and leak check. Standard Equipment warranty to include 5-year parts, 1 year labor, 20-year Heat Exchanger and 10-year workmanship warranty on gas line.
Haywood High School
Bid packages include concrete, electrical, plumbing, greenhouse, installation of greenhouse.
Posted Date
May 29, 2025
Due Date
Oct 28, 2025
Release: May 29, 2025
Haywood High School
Close: Oct 28, 2025
Bid packages include concrete, electrical, plumbing, greenhouse, installation of greenhouse.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.