Discover Opportunities months before the RFP drops
Learn more →Providing inmate medical services specifically to the county jail inmate population.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Close: Dec 12, 2025
Providing inmate medical services specifically to the county jail inmate population.
Publication of Legal Notices in compliance with applicable Kansas Statutes for publications beginning on or after January 1, 2026.
Posted Date
Nov 18, 2025
Due Date
Dec 12, 2025
Release: Nov 18, 2025
Close: Dec 12, 2025
Publication of Legal Notices in compliance with applicable Kansas Statutes for publications beginning on or after January 1, 2026.
Project consists of the following: This project consists of the demolition of an existing Steel Beam Continuous Bridge and the construction of a replacement Reinforced Concrete Haunched Slab (R.C.S.H.) Bridge over the Middle Branch Emma Creek. The existing bridge is a 3-span, 110-foot-long structure with a concrete deck, abutments, and piers. The replacement structure is a 120-foot-long R.C.S.H. bridge with a 28-foot-wide roadway. Associated improvements will include concrete approach slabs, steel guardrail, embankment grading, riprap slope protection, and roadway rehabilitation and reconstruction. The roadway rehabilitation and reconstruction will include full-depth repair, base construction, and a 2” mill and overlay. The construction will include temporary and permanent erosion control measures, traffic control, and signing.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
Project consists of the following: This project consists of the demolition of an existing Steel Beam Continuous Bridge and the construction of a replacement Reinforced Concrete Haunched Slab (R.C.S.H.) Bridge over the Middle Branch Emma Creek. The existing bridge is a 3-span, 110-foot-long structure with a concrete deck, abutments, and piers. The replacement structure is a 120-foot-long R.C.S.H. bridge with a 28-foot-wide roadway. Associated improvements will include concrete approach slabs, steel guardrail, embankment grading, riprap slope protection, and roadway rehabilitation and reconstruction. The roadway rehabilitation and reconstruction will include full-depth repair, base construction, and a 2” mill and overlay. The construction will include temporary and permanent erosion control measures, traffic control, and signing.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis