Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Harbor Towns Inc.'s meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Harbor Towns Inc.
Project includes the renovation of existing warehouse space into multiple restrooms. Renovations include the construction of two restrooms and one shower room. Specific scopes of work include framing, painting, plumbing, mechanical, and electrical.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Harbor Towns Inc.
Close: Jan 27, 2026
Project includes the renovation of existing warehouse space into multiple restrooms. Renovations include the construction of two restrooms and one shower room. Specific scopes of work include framing, painting, plumbing, mechanical, and electrical.
AvailableHarbor Towns Inc.
Design-build: seeks a qualified general contractor to provide design-build services to engage in a aia a141 (standard form of agreement between owner and design-builder) as agent to manage several municipal dock and waterfront infrastructure construction projects. Dock and waterfront infrastructure projects may include, butnot be limited to, boardwalks,pump outs, electrical and waterservice, rest rooms and showers, docks and boat slips, andpavilions and shelters. Responsibilities include preliminary engineering and architectural design, preliminary costestimation, obtaining necessaryproject permits, bid requirementdocumentation, proposal solicitation, coordination of winning bid determination with ourboard of directors, management and record keeping for reporting for each project, qualitycontrol during project construction, and verification of project completion.
Posted Date
Jan 19, 2025
Due Date
Jan 31, 2025
Release: Jan 19, 2025
Harbor Towns Inc.
Close: Jan 31, 2025
Design-build: seeks a qualified general contractor to provide design-build services to engage in a aia a141 (standard form of agreement between owner and design-builder) as agent to manage several municipal dock and waterfront infrastructure construction projects. Dock and waterfront infrastructure projects may include, butnot be limited to, boardwalks,pump outs, electrical and waterservice, rest rooms and showers, docks and boat slips, andpavilions and shelters. Responsibilities include preliminary engineering and architectural design, preliminary costestimation, obtaining necessaryproject permits, bid requirementdocumentation, proposal solicitation, coordination of winning bid determination with ourboard of directors, management and record keeping for reporting for each project, qualitycontrol during project construction, and verification of project completion.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.