Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Hancock County Soil Conservation District
Construct a 420' by 250' concrete apron to the south of the existing North Apron and adjacent Taxilane Sierra, remove and reinstall existing edge lights, grading of surrounding apron, and cleanout existing channel.
Posted Date
Jan 1, 2026
Due Date
Feb 18, 2026
Release: Jan 1, 2026
Hancock County Soil Conservation District
Close: Feb 18, 2026
Construct a 420' by 250' concrete apron to the south of the existing North Apron and adjacent Taxilane Sierra, remove and reinstall existing edge lights, grading of surrounding apron, and cleanout existing channel.
Hancock County Soil Conservation District
Work includes rehabilitation of the concrete apron surrounding the arff station at international airport, concrete replacement, subgrade preparation, asphalt replacement, crack and joint seal, and other miscellaneous items.
Posted Date
Mar 26, 2026
Due Date
Apr 28, 2026
Release: Mar 26, 2026
Hancock County Soil Conservation District
Close: Apr 28, 2026
Work includes rehabilitation of the concrete apron surrounding the arff station at international airport, concrete replacement, subgrade preparation, asphalt replacement, crack and joint seal, and other miscellaneous items.
AvailableHancock County Soil Conservation District
Work includes 1 LS of mobilization; 1,025 SY of asphalt pavement removal (full depth); 500 SY of concrete pavement removal 9 (full depth); 9,700 CY of unclassified excavation; 1,700 CY of embankment in place (borrow off-site); 5,700 CY of undercut and related backfill; 6,000 CY of lime-treated subgrade; 870 LF of remove chain-link fence and gate; 460 LF of install chain-link fence; 1,100 CY of crushed aggregate base course; 6,000 SY of separation geotextile, class 2, woven; 1,400 TN of asphalt surface course; 1,700 GAL of emulsified asphalt prime coat; etc, see outside link.
Posted Date
Mar 12, 2026
Due Date
Apr 14, 2026
Release: Mar 12, 2026
Hancock County Soil Conservation District
Close: Apr 14, 2026
Work includes 1 LS of mobilization; 1,025 SY of asphalt pavement removal (full depth); 500 SY of concrete pavement removal 9 (full depth); 9,700 CY of unclassified excavation; 1,700 CY of embankment in place (borrow off-site); 5,700 CY of undercut and related backfill; 6,000 CY of lime-treated subgrade; 870 LF of remove chain-link fence and gate; 460 LF of install chain-link fence; 1,100 CY of crushed aggregate base course; 6,000 SY of separation geotextile, class 2, woven; 1,400 TN of asphalt surface course; 1,700 GAL of emulsified asphalt prime coat; etc, see outside link.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Hancock County Soil Conservation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database