Boiler & Temp Controls Replacement Parcells Middle School (Request for Proposals)
Posted
Sep 16, 2026
Oct 27, 2026
Work include removal of existing boilers, domestic water heater, water storage tank, piping, steam condensate return units, bucket traps, and other items. Removal of existing pool boiler (not to be replaced). Installation of new boilers, domestic water heater, water storage tank, piping, steam condensate return units, bucket traps, steam traps, pipe insulation, and other items. Installation of new temperature controls system including control valves, wiring, control panels, etc. Roof penetrations and associated flashings for new thru-roof penetrations.

