CMGM250097 - Greenville IAR Resurfacing RFP
Posted
Sep 17, 2026
Oct 22, 2026
119 lin ft of pipe removal, 500 cu yds of borrow excavation, 306 cu yds of structure excavation, 24140 sq yds of bituminous treatment g, 3084 gallons of tack coat, 2877 tons of superpave wearing surface, 300 tons of superpave patching and leveling, 150 tons of aggregate surfacing, 65 lin ft of 30 r. C. Roadway pipe with 2 end treatments, 68 lin ft of 60 r. C. Roadway pipe with 2 end treatments, 100 tons of class 2 riprap, temporary striping, permanent striping and other miscellaneous items for general roadway construction including erosion control and traffic control items.

