Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Greater New Bedford Regional Vocational High School
Seeking proposals from qualified proposers to conduct a comprehensive aviation maintenance technology (vamt) feasibility and planning study. The chosen proposer will serve as the dedicated project manager for this exploration phase.
Posted Date
Jul 22, 2026
Due Date
Aug 11, 2026
Release: Jul 22, 2026
Greater New Bedford Regional Vocational High School
Close: Aug 11, 2026
Seeking proposals from qualified proposers to conduct a comprehensive aviation maintenance technology (vamt) feasibility and planning study. The chosen proposer will serve as the dedicated project manager for this exploration phase.
AvailableGreater New Bedford Regional Vocational High School
Project consists of new construction of a 7,100 SF one-story pre-engineered steel framed structure with a connector link to the existing school building. The building envelope consists of brick veneer, insulated metal panels, EPDM roofing and aluminum doors and windows. The interior consists of open shop spaces, bathrooms, storage and equipment mezzanine.
Posted Date
Jun 15, 2026
Due Date
Jun 25, 2026
Release: Jun 15, 2026
Greater New Bedford Regional Vocational High School
Close: Jun 25, 2026
Project consists of new construction of a 7,100 SF one-story pre-engineered steel framed structure with a connector link to the existing school building. The building envelope consists of brick veneer, insulated metal panels, EPDM roofing and aluminum doors and windows. The interior consists of open shop spaces, bathrooms, storage and equipment mezzanine.
Greater New Bedford Regional Vocational High School
Project consists of new construction of a 7,100 SF one-story pre-engineered steel framed structure with a connector link to the existing school building. The building envelope consists of brick veneer, insulated metal panels, EPDM roofing and aluminum doors and windows. The interior consists of open shop spaces, bathrooms, storage and equipment mezzanine.
Posted Date
Jun 10, 2026
Due Date
Jul 15, 2026
Release: Jun 10, 2026
Greater New Bedford Regional Vocational High School
Close: Jul 15, 2026
Project consists of new construction of a 7,100 SF one-story pre-engineered steel framed structure with a connector link to the existing school building. The building envelope consists of brick veneer, insulated metal panels, EPDM roofing and aluminum doors and windows. The interior consists of open shop spaces, bathrooms, storage and equipment mezzanine.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than ~$10,000, use sole source. Otherwise, not viable here—redirect to a formal, advertised solicitation via COMMBUYS.
Coops: Buyer hasn’t historically used coops; encourage them to explore these procurement programs as future options.
Entity: Greater New Bedford Regional Vocational School District, MA
Practice: No sole source history; strict adherence to competitive bidding under M.G.L. Ch. 30B.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge