Discover Opportunities months before the RFP drops
Learn more →combined sewer overflow Facilities Improvements - Screening and Disinfection Facility (SDF) - Disinfection, Screening and Misc. Improvements: Chemical feed, storage and mixing system improvements, Screen system improvements, Select HVAC system improvements, Electrical power, lighting and building systems, Instrumentation and controls, Access hatches, CSO Facility Safety Improvements and Building Rehabilitation, Address the safety and architectural deficiencies identified as part of the “CS-299 Multidisciplinary Needs Assessment” for all nine CSO facilities. Control System Upgrades at Creek and CSO Facilities: Implementation of a series of lighting and instrumentation and control (I&C) system improvements needed at GLWA’s Belle Isle CSO and Baby Creek SDF facilities
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Close: Jan 6, 2026
combined sewer overflow Facilities Improvements - Screening and Disinfection Facility (SDF) - Disinfection, Screening and Misc. Improvements: Chemical feed, storage and mixing system improvements, Screen system improvements, Select HVAC system improvements, Electrical power, lighting and building systems, Instrumentation and controls, Access hatches, CSO Facility Safety Improvements and Building Rehabilitation, Address the safety and architectural deficiencies identified as part of the “CS-299 Multidisciplinary Needs Assessment” for all nine CSO facilities. Control System Upgrades at Creek and CSO Facilities: Implementation of a series of lighting and instrumentation and control (I&C) system improvements needed at GLWA’s Belle Isle CSO and Baby Creek SDF facilities
AvailableThe Great Lakes Water Authority (GLWA) issued this RFB seeking qualified vendors to perform CSO Facilities Improvements II, which includes installation of a complete communications cable plant (voice, data, AV, security and low-voltage systems) at Harris Health System facilities in Houston, Texas. The scope includes Category 6A horizontal cabling, grounding and bonding, coordination with electrical contractors, equipment room fittings, and compliance with applicable NEC/NFPA/ANSI standards.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
The Great Lakes Water Authority (GLWA) issued this RFB seeking qualified vendors to perform CSO Facilities Improvements II, which includes installation of a complete communications cable plant (voice, data, AV, security and low-voltage systems) at Harris Health System facilities in Houston, Texas. The scope includes Category 6A horizontal cabling, grounding and bonding, coordination with electrical contractors, equipment room fittings, and compliance with applicable NEC/NFPA/ANSI standards.
AvailableGreat Lakes Water Authority is soliciting bids for improvements to the Water Resource Recovery Facility (WRRF) sludge feed system used for solids processing, including associated construction and related work. Bidders must submit required documents (e.g., bid bond, vendor certifications) via the Bonfire portal by the stated Close Date.
Posted Date
Oct 20, 2025
Due Date
Jan 9, 2026
Release: Oct 20, 2025
Close: Jan 9, 2026
Great Lakes Water Authority is soliciting bids for improvements to the Water Resource Recovery Facility (WRRF) sludge feed system used for solids processing, including associated construction and related work. Bidders must submit required documents (e.g., bid bond, vendor certifications) via the Bonfire portal by the stated Close Date.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis