Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Goshen Municipal Airport's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Goshen Municipal Airport
Works include approx. 1,500 LF of installation and removal of silt fence (undistributed); 1,041 CY unclassified excavation; 2,500 SY 9" portland cement concrete pavement; 275 LF of no. 6 AWG, solid, bate copper counterpoise wire, installed in Trench. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 15, 2025
Release: Nov 25, 2025
Goshen Municipal Airport
Close: Dec 15, 2025
Works include approx. 1,500 LF of installation and removal of silt fence (undistributed); 1,041 CY unclassified excavation; 2,500 SY 9" portland cement concrete pavement; 275 LF of no. 6 AWG, solid, bate copper counterpoise wire, installed in Trench. See outside link.
Goshen Municipal Airport
Provide renovation, construction, and expansion of the airport maintenance building. The Project includes remodeling the existing maintenance building and constructing a new 28' x 80' addition on the east side of the building. The renovation involves exterior and interior upgrades, including replacement of roofing, siding, windows, doors, insulation, and complete electrical system rewiring. Interior improvements include new heating and lighting systems, concrete flooring repairs, and construction of an office and tool/storage room. The addition will be a three-sided pole-type structure with concrete piers, overhead doors, and necessary egress and ventilation features.
Posted Date
Jul 18, 2025
Due Date
Aug 14, 2025
Release: Jul 18, 2025
Goshen Municipal Airport
Close: Aug 14, 2025
Provide renovation, construction, and expansion of the airport maintenance building. The Project includes remodeling the existing maintenance building and constructing a new 28' x 80' addition on the east side of the building. The renovation involves exterior and interior upgrades, including replacement of roofing, siding, windows, doors, insulation, and complete electrical system rewiring. Interior improvements include new heating and lighting systems, concrete flooring repairs, and construction of an office and tool/storage room. The addition will be a three-sided pole-type structure with concrete piers, overhead doors, and necessary egress and ventilation features.
Goshen Municipal Airport
Project includes contractor quality control program 1 ls; construction engineering 1 LS; mobilization 1 LS; maintenance of traffic 1 LS; narrow joint and crack repair (undistributed) 28,900 LF; wide joint and crack repair (undistributed) 9,600 LF; full depth repair (include removal and prep) 1,400 SY; cold milling, 2.5" 71,600 SY; asphalt leveling course 5,660 ton; asphalt surface course 8,980 ton; emulsified asphalt tack coat 15,200 gal; surface preparation 40 SF; marking 85,180 SF; reflective media 7730 LB: temporary runway and taxiway marking 85,180 SF; grooving 53,333 SY; seeding (undistributed) 20 KSF: topsoil (furnished from off the site) 120 CY. See attached file.
Posted Date
May 9, 2025
Due Date
Aug 11, 2025
Release: May 9, 2025
Goshen Municipal Airport
Close: Aug 11, 2025
Project includes contractor quality control program 1 ls; construction engineering 1 LS; mobilization 1 LS; maintenance of traffic 1 LS; narrow joint and crack repair (undistributed) 28,900 LF; wide joint and crack repair (undistributed) 9,600 LF; full depth repair (include removal and prep) 1,400 SY; cold milling, 2.5" 71,600 SY; asphalt leveling course 5,660 ton; asphalt surface course 8,980 ton; emulsified asphalt tack coat 15,200 gal; surface preparation 40 SF; marking 85,180 SF; reflective media 7730 LB: temporary runway and taxiway marking 85,180 SF; grooving 53,333 SY; seeding (undistributed) 20 KSF: topsoil (furnished from off the site) 120 CY. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.