High School Auditorium Stage Floor Replacement RFP
Posted
Sep 22, 2026
Oct 2, 2026
High school auditorium stage floor replacement project. The project generally consists of the complete demolition and removal of the existing water-damaged auditorium stage floor system to the concrete slab and installation of a new resilient stage floor system, including vapor barrier, wood sleeper system, resilient pads, sound/fire batt insulation, plywood subfloor, tempered hardboard finish flooring, stage-grade black paint, associated accessories, and all related labor, materials, equipment, protection, disposal, and incidental work necessary for a complete installation.
