Discover Opportunities months before the RFP drops
Learn more →Provide vending services for their campus locations.
Posted Date
Aug 13, 2025
Due Date
Sep 30, 2025
Release: Aug 13, 2025
Close: Sep 30, 2025
Provide vending services for their campus locations.
Construction of ADA ramp. The scope of site work includes, but is not limited to the following: 1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.
Posted Date
May 28, 2025
Due Date
Jun 30, 2025
Release: May 28, 2025
Close: Jun 30, 2025
Construction of ADA ramp. The scope of site work includes, but is not limited to the following: 1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.
Purchase a sole brand Optometry Pkg & Software, install & training for its Opticianry Program. Digital Optometrics Advance Package-Software; Topcon CC-100 with infrared emitter for CV5000/S, Retinal Camera:iCare DRS plus; Digital Phoropter, Topcon Interface kit for CV5000/S; Video Slit Lamp: Mediworks S390L Firefly; Automated Tonometer-Reichert7 NCT.
Posted Date
May 28, 2025
Due Date
Jun 30, 2025
Release: May 28, 2025
Close: Jun 30, 2025
Purchase a sole brand Optometry Pkg & Software, install & training for its Opticianry Program. Digital Optometrics Advance Package-Software; Topcon CC-100 with infrared emitter for CV5000/S, Retinal Camera:iCare DRS plus; Digital Phoropter, Topcon Interface kit for CV5000/S; Video Slit Lamp: Mediworks S390L Firefly; Automated Tonometer-Reichert7 NCT.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis