Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of ADA ramp. The scope of site work includes, but is not limited to the following: 1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
ADA Ramp.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
ADA Ramp.
AvailableWork includes ada curb ramp installation.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Work includes ada curb ramp installation.
AvailableRelease: Nov 26, 2025
Close: Dec 23, 2025
ADA ramp improvement.
AvailableProject consists of planetarium ada ramp.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
Project consists of planetarium ada ramp.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis