Discover Opportunities months before the RFP drops
Learn more →Provide single-rider student transportation services on an as-needed basis including, without limitation, general and special education transportation to and from home for all bell schedules, including for ambulatory and non-ambulatory students with physical, mental, or emotional disabilities, and for field trips or other destinations as required Services.
Posted Date
-
Due Date
Oct 17, 2025
Close: Oct 17, 2025
Provide single-rider student transportation services on an as-needed basis including, without limitation, general and special education transportation to and from home for all bell schedules, including for ambulatory and non-ambulatory students with physical, mental, or emotional disabilities, and for field trips or other destinations as required Services.
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the high school new music building project. This project aims to create state-of-the-art music and choir facility at High School to replace the existing one, which is too small and outdated for a modern music program. The project involves demolishing the existing 5,000 Sf music building and conducting surrounding site work. We plan to construct a new music building of approx. 10,000 SF, along with necessary pathways and site work. The design will focus on meeting acoustic separation requirements for different uses, including Band, Orchestra, and Choir. The new facility will feature storage and practice ensemble rooms, director offices, and primary classroom space for both Choir and Band. Additionally, it will include dedicated restroom facilities, fire sprinkler riser space, and music instrument storage. This project may also include repainting nearby buildings.
Posted Date
May 10, 2025
Due Date
May 29, 2025
Release: May 10, 2025
Close: May 29, 2025
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the high school new music building project. This project aims to create state-of-the-art music and choir facility at High School to replace the existing one, which is too small and outdated for a modern music program. The project involves demolishing the existing 5,000 Sf music building and conducting surrounding site work. We plan to construct a new music building of approx. 10,000 SF, along with necessary pathways and site work. The design will focus on meeting acoustic separation requirements for different uses, including Band, Orchestra, and Choir. The new facility will feature storage and practice ensemble rooms, director offices, and primary classroom space for both Choir and Band. Additionally, it will include dedicated restroom facilities, fire sprinkler riser space, and music instrument storage. This project may also include repainting nearby buildings.
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the high school building f2 (black box) modernization project. The project involves the modernization of the F2 Performing Art Classrooms Building at Monta Vista High School. The scope of the modernization will include architectural improvements and structural rehabilitation of the building as well as interior redesigns to provide additional storage and accessory spaces for the existing drama classroom. This work involves, but is not limited to, the replacement of roofing, electrical, HVAC, and lighting systems, along with fire alarm upgrades, new theatrical lighting, and acoustic treatments. Additionally, the audio-visual system will be upgraded, and site improvements will be made as needed to comply with code requirements to improve the path of travel. The project will also include interior and exterior painting.
Posted Date
May 2, 2025
Due Date
May 29, 2025
Release: May 2, 2025
Close: May 29, 2025
Provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the high school building f2 (black box) modernization project. The project involves the modernization of the F2 Performing Art Classrooms Building at Monta Vista High School. The scope of the modernization will include architectural improvements and structural rehabilitation of the building as well as interior redesigns to provide additional storage and accessory spaces for the existing drama classroom. This work involves, but is not limited to, the replacement of roofing, electrical, HVAC, and lighting systems, along with fire alarm upgrades, new theatrical lighting, and acoustic treatments. Additionally, the audio-visual system will be upgraded, and site improvements will be made as needed to comply with code requirements to improve the path of travel. The project will also include interior and exterior painting.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis