Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Franklintown Borough Muncipal (Water) Authority
Franklintown Borough Municipal Authority (York County, PA) issued an RFB seeking sealed proposals to install Authority pre-purchased generators and automatic transfer switches at two well sites, including offloading and installation on existing pads, wiring, and control connections. A mandatory/encouraged pre-bid site visit is scheduled for Dec 15, 2025 from 10:00 AM to 12:00 PM at the Water Treatment Plant in Franklintown Borough. Proposals must be submitted via PennBid by Jan 19, 2026 at 1:00 PM EST and require a certified check or bid bond equal to 10% of the bid; the project is subject to Pennsylvania prevailing wage and Commonwealth Financing Authority funding conditions.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Franklintown Borough Muncipal (Water) Authority
Close: Jan 19, 2026
Franklintown Borough Municipal Authority (York County, PA) issued an RFB seeking sealed proposals to install Authority pre-purchased generators and automatic transfer switches at two well sites, including offloading and installation on existing pads, wiring, and control connections. A mandatory/encouraged pre-bid site visit is scheduled for Dec 15, 2025 from 10:00 AM to 12:00 PM at the Water Treatment Plant in Franklintown Borough. Proposals must be submitted via PennBid by Jan 19, 2026 at 1:00 PM EST and require a certified check or bid bond equal to 10% of the bid; the project is subject to Pennsylvania prevailing wage and Commonwealth Financing Authority funding conditions.
Franklintown Borough Muncipal (Water) Authority
Project includes installation of Authority pre-purchased generators and transfer switches for Well No 1 and Well No 2 sites. Work generally includes offloading and installation of new generators to existing concrete pads, and installation of transfer switches including wiring and connections in building interior and to control system.
Posted Date
Dec 8, 2025
Due Date
Mar 30, 2026
Release: Dec 8, 2025
Franklintown Borough Muncipal (Water) Authority
Close: Mar 30, 2026
Project includes installation of Authority pre-purchased generators and transfer switches for Well No 1 and Well No 2 sites. Work generally includes offloading and installation of new generators to existing concrete pads, and installation of transfer switches including wiring and connections in building interior and to control system.
AvailableFranklintown Borough Muncipal (Water) Authority
Franklintown Borough Municipal Authority (York County, PA) is soliciting sealed bids to install pre-purchased generators and transfer switches for two well sites as part of a Water Treatment System Backup Power project. The work includes offloading and installing generators onto existing pads, installing transfer switches, wiring/connectivity inside buildings, and integrating with the control system; the project is subject to Pennsylvania prevailing wage and Commonwealth Financing Authority conditions. Proposals are submitted online via the PennBid platform; bids are due Jan 19, 2026 and the contract is expected to be completed by Sept 30, 2026.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Franklintown Borough Muncipal (Water) Authority
Close: Jan 19, 2026
Franklintown Borough Municipal Authority (York County, PA) is soliciting sealed bids to install pre-purchased generators and transfer switches for two well sites as part of a Water Treatment System Backup Power project. The work includes offloading and installing generators onto existing pads, installing transfer switches, wiring/connectivity inside buildings, and integrating with the control system; the project is subject to Pennsylvania prevailing wage and Commonwealth Financing Authority conditions. Proposals are submitted online via the PennBid platform; bids are due Jan 19, 2026 and the contract is expected to be completed by Sept 30, 2026.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Franklintown Borough Muncipal (Water) Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database