Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Franconia Sewer Authority
Construction of approx. 12,200 LF of 2-, 3- and 4" low pressure sanitary sewer main and appurtenances, including road/site restoration and extension of services to roughly 115 properties. The 2-, 3- and 4" pressure sewer shall be SDR-21 PVC pipe or SDR-11 HDPE pipe. Contractor may select the method of pipe installation, such as open-trenching with backhoe/excavator, open-trenching with chain trenching machine, directional drilling, or other methods in the range of these options. Regardless of installation method, upon familiarization with site conditions and prior to mobilization, Contractor shall provide Engineer with an intended installation plan which shows intended method of pipe installation for each length of pipe (mains and laterals) for the entire project, including proposed step-by-step schedule for such installation. Installation plan shall also stipulate method of lateral-to-main connection (e.g., electro-fusion, etc.) for each unique connection involving the various lateral-to-main diameters.
Posted Date
Apr 28, 2026
Due Date
May 19, 2026
Release: Apr 28, 2026
Franconia Sewer Authority
Close: May 19, 2026
Construction of approx. 12,200 LF of 2-, 3- and 4" low pressure sanitary sewer main and appurtenances, including road/site restoration and extension of services to roughly 115 properties. The 2-, 3- and 4" pressure sewer shall be SDR-21 PVC pipe or SDR-11 HDPE pipe. Contractor may select the method of pipe installation, such as open-trenching with backhoe/excavator, open-trenching with chain trenching machine, directional drilling, or other methods in the range of these options. Regardless of installation method, upon familiarization with site conditions and prior to mobilization, Contractor shall provide Engineer with an intended installation plan which shows intended method of pipe installation for each length of pipe (mains and laterals) for the entire project, including proposed step-by-step schedule for such installation. Installation plan shall also stipulate method of lateral-to-main connection (e.g., electro-fusion, etc.) for each unique connection involving the various lateral-to-main diameters.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Executive Director, Franconia Sewer Authority
Premium
Access the largest public sector contact database