Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fort Cobb Master Conservancy District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Fort Cobb Master Conservancy District
Work consists of reservoir sleeve valve replacement project involves the removal and replacement of a 24" vertical submerged sleeve valve located inside a stilling well at the outlet works of the dam. Actuation improvements: install a new EIM actuator on the replacement valve to align with system standardization; electrical improvements: install new duct bank conduit between the control room and the valve and other related improvements; structure improvements: remove and replace the existing structure covering the sleeve valve.
Posted Date
-
Due Date
Jan 9, 2026
Fort Cobb Master Conservancy District
Close: Jan 9, 2026
Work consists of reservoir sleeve valve replacement project involves the removal and replacement of a 24" vertical submerged sleeve valve located inside a stilling well at the outlet works of the dam. Actuation improvements: install a new EIM actuator on the replacement valve to align with system standardization; electrical improvements: install new duct bank conduit between the control room and the valve and other related improvements; structure improvements: remove and replace the existing structure covering the sleeve valve.
AvailableFort Cobb Master Conservancy District
Install miscellaneous piping, valving and SCADA, telemetry and controls.
Posted Date
Oct 20, 2025
Due Date
Nov 20, 2025
Release: Oct 20, 2025
Fort Cobb Master Conservancy District
Close: Nov 20, 2025
Install miscellaneous piping, valving and SCADA, telemetry and controls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.