Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fond du Lac Development Corporation
New composting facility and related site improvements.
Posted Date
Feb 19, 2026
Due Date
Mar 17, 2026
Release: Feb 19, 2026
Fond du Lac Development Corporation
Close: Mar 17, 2026
New composting facility and related site improvements.
AvailableFond du Lac Development Corporation
Project consists of a new 15,746 SF one story multi-family residential building with 18 one bedroom units and a shared mechanical room, and sitework. The building shall consist of a poured concrete slab foundation, wood framed structure with metal stud interior partitions, engineered wood siding, veneer masonry, wood roof trusses, and metal roof. Project includes a backup generator with enclosure, snow melt hydronic loop system as an alternate, trash enclosures, and mailboxes. Mechanical, Electrical, and Plumbing work scope is as defined in the contract documents. The sitework shall consist of grubbing, excavation, site utilities, regrading, concrete sidewalks, and parking lots. The landscaping shall consist of soil prepping, seeding, and planting.
Posted Date
Feb 13, 2025
Due Date
Mar 20, 2025
Release: Feb 13, 2025
Fond du Lac Development Corporation
Close: Mar 20, 2025
Project consists of a new 15,746 SF one story multi-family residential building with 18 one bedroom units and a shared mechanical room, and sitework. The building shall consist of a poured concrete slab foundation, wood framed structure with metal stud interior partitions, engineered wood siding, veneer masonry, wood roof trusses, and metal roof. Project includes a backup generator with enclosure, snow melt hydronic loop system as an alternate, trash enclosures, and mailboxes. Mechanical, Electrical, and Plumbing work scope is as defined in the contract documents. The sitework shall consist of grubbing, excavation, site utilities, regrading, concrete sidewalks, and parking lots. The landscaping shall consist of soil prepping, seeding, and planting.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Fond du Lac Development Corporation's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fond du Lac Development Corporation's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database