Discover Opportunities months before the RFP drops
Learn more →1,250 LB of Beans, Dry, Black Beans, Whole, U.S. Grade 1 - 3; 500 LB of Beans, Dry, Black Eyed Peas, U.S. Grade 1 - 3; 1,000 LB of Beans, Dry, Great Northern, Whole, U.S. Grade 1 - 3; 50 LB of Beans, Dry, Kidney or Red, Whole, U.S. Grade 1 - 3; 5,000 LB of Beans, Dry, Lentils, Whole, U.S. Grade 1 - 3. See attached file.
Posted Date
Aug 28, 2025
Due Date
Sep 8, 2025
Release: Aug 28, 2025
Close: Sep 8, 2025
1,250 LB of Beans, Dry, Black Beans, Whole, U.S. Grade 1 - 3; 500 LB of Beans, Dry, Black Eyed Peas, U.S. Grade 1 - 3; 1,000 LB of Beans, Dry, Great Northern, Whole, U.S. Grade 1 - 3; 50 LB of Beans, Dry, Kidney or Red, Whole, U.S. Grade 1 - 3; 5,000 LB of Beans, Dry, Lentils, Whole, U.S. Grade 1 - 3. See attached file.
135 EA of Contractor to provide mattresses for inmate population housed: Size - 76" x26" x 2" with built in headrest; Fabric- Vinyl; Meets and exceeds the requirements of California Technical Bulletins 129 and 603, 16 CFR Part 1632 & 1633; Seam strength - 532lbs/ min.
Posted Date
Jul 30, 2025
Due Date
Aug 4, 2025
Release: Jul 30, 2025
Close: Aug 4, 2025
135 EA of Contractor to provide mattresses for inmate population housed: Size - 76" x26" x 2" with built in headrest; Fabric- Vinyl; Meets and exceeds the requirements of California Technical Bulletins 129 and 603, 16 CFR Part 1632 & 1633; Seam strength - 532lbs/ min.
The contractor shall perform removal and replacement of the door and make all necessary alteration to the cooler walls to fit the new larger door. Mobilization of materials to include purchase and delivery of new door and all materials need to complete the installation to the institution. Assemble or install all rigging equipment needed for installation. Disassemble and remove existing door to include all electric and plumbing connections. Make necessary cuts to cooler walls to enlarge the doorway to accommodate oversized door. Ensure proper supports are in place to stabilize the structure of the cooler during alterations. Install new lintel to support the header and ceiling of the cooler and maintain structural integrity of the unit with new larger doorway. Install new overlay frame and door making all adjustment for proper fitment. Test the function of the door opening, closing, latching, and gasket seals. Extent and connect all electric and plumbing connections to new door and wall. Install capping over new door jamb. Paint all surfaces to match the color of the door as close as possible. Restore electrical power to the door and verify all heated surfaces are heating properly. Install a new heavy-duty barrel lock set on the exterior of the door. Dispose of old door and all debris generated from alterations to the cooler.
Posted Date
Apr 10, 2025
Due Date
Apr 18, 2025
Release: Apr 10, 2025
Close: Apr 18, 2025
The contractor shall perform removal and replacement of the door and make all necessary alteration to the cooler walls to fit the new larger door. Mobilization of materials to include purchase and delivery of new door and all materials need to complete the installation to the institution. Assemble or install all rigging equipment needed for installation. Disassemble and remove existing door to include all electric and plumbing connections. Make necessary cuts to cooler walls to enlarge the doorway to accommodate oversized door. Ensure proper supports are in place to stabilize the structure of the cooler during alterations. Install new lintel to support the header and ceiling of the cooler and maintain structural integrity of the unit with new larger doorway. Install new overlay frame and door making all adjustment for proper fitment. Test the function of the door opening, closing, latching, and gasket seals. Extent and connect all electric and plumbing connections to new door and wall. Install capping over new door jamb. Paint all surfaces to match the color of the door as close as possible. Restore electrical power to the door and verify all heated surfaces are heating properly. Install a new heavy-duty barrel lock set on the exterior of the door. Dispose of old door and all debris generated from alterations to the cooler.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis