Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor shall perform removal and replacement of the door and make all necessary alteration to the cooler walls to fit the new larger door. Mobilization of materials to include purchase and delivery of new door and all materials need to complete the installation to the institution. Assemble or install all rigging equipment needed for installation. Disassemble and remove existing door to include all electric and plumbing connections. Make necessary cuts to cooler walls to enlarge the doorway to accommodate oversized door. Ensure proper supports are in place to stabilize the structure of the cooler during alterations. Install new lintel to support the header and ceiling of the cooler and maintain structural integrity of the unit with new larger doorway. Install new overlay frame and door making all adjustment for proper fitment. Test the function of the door opening, closing, latching, and gasket seals. Extent and connect all electric and plumbing connections to new door and wall. Install capping over new door jamb. Paint all surfaces to match the color of the door as close as possible. Restore electrical power to the door and verify all heated surfaces are heating properly. Install a new heavy-duty barrel lock set on the exterior of the door. Dispose of old door and all debris generated from alterations to the cooler.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Supply Emmet County with the removal and replacement of the existing walk-in cooler and freezer in the main kitchen area at Bay Bluffs senior medical facility.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Supply Emmet County with the removal and replacement of the existing walk-in cooler and freezer in the main kitchen area at Bay Bluffs senior medical facility.
AvailableThe buyer is soliciting bids for removal and replacement of a walk-in cooler and freezer at Bay Bluffs. The solicitation was published on 2026-01-09 and is open with a closing deadline of 2026-02-17 at 02:00 PM EST. Full solicitation documents and buyer contact information are restricted to registered members on the buyer-managed site.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
The buyer is soliciting bids for removal and replacement of a walk-in cooler and freezer at Bay Bluffs. The solicitation was published on 2026-01-09 and is open with a closing deadline of 2026-02-17 at 02:00 PM EST. Full solicitation documents and buyer contact information are restricted to registered members on the buyer-managed site.
Procurement of a CNP Walk-In Cooler/Freezer for Oak Mountain Middle School.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Procurement of a CNP Walk-In Cooler/Freezer for Oak Mountain Middle School.
AvailableReplacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis