Construction of the Division A and B Waterworks Project RFP
Posted
Sep 9, 2026
Sep 30, 2026
Work includes construction of the division a and b waterworks project. Division a Wellfield and distribution system improvements will consist of: installation of a permanently affixed 100 kW emergency standby generator and automatic transfer switch (ATS) with a concrete pad and all associated electrical work; installation of 651 radio read meters throughout the system; installation of meter antenna and receiver unit for data collection from radio meters; installation of four (4) isolation valves within the distribution system at key locations; work also includes all associated site restoration, including drive repair, sidewalk repair, and seeding, as generally intended.