Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Evergreen High School
Cta minor works roof rehabilitation. Pressure washing, abrasive blasting of existing metal panels, removal of existing metal panel finishing system, applying rust inhibiting primer, installing all sheet metal elements, applying base finishing coat, and applying final finish coat across select roof and wall surfaces. , installation of new single-point fall protection anchors along the ridge of the roof areas as depicted, disconnection, displacement, modification, and reinstallation of existing mechanical, electrical, and/or plumbing equipment and distribution systems as necessary to allow modification or replacement of existing support curbs, removal and reinstallation of associated existing sheet metal flashing materials, installation of new metal panel covers, closure flashings, storm collars, penetration boots, and other sheet metal flashings. Alternate 1 - partial removal of existing membrane roof system and related sheet metal flashings, and installation of new sheet metal flashings and membrane roof system patch back. Alternate 2 - installation of fall protection anchors building 400 at the roof level.
Posted Date
Mar 26, 2026
Due Date
Apr 16, 2026
Release: Mar 26, 2026
Evergreen High School
Close: Apr 16, 2026
Cta minor works roof rehabilitation. Pressure washing, abrasive blasting of existing metal panels, removal of existing metal panel finishing system, applying rust inhibiting primer, installing all sheet metal elements, applying base finishing coat, and applying final finish coat across select roof and wall surfaces. , installation of new single-point fall protection anchors along the ridge of the roof areas as depicted, disconnection, displacement, modification, and reinstallation of existing mechanical, electrical, and/or plumbing equipment and distribution systems as necessary to allow modification or replacement of existing support curbs, removal and reinstallation of associated existing sheet metal flashing materials, installation of new metal panel covers, closure flashings, storm collars, penetration boots, and other sheet metal flashings. Alternate 1 - partial removal of existing membrane roof system and related sheet metal flashings, and installation of new sheet metal flashings and membrane roof system patch back. Alternate 2 - installation of fall protection anchors building 400 at the roof level.
AvailableEvergreen High School
The general scope of work includes Provide a full building HVAC controls upgrade for the 500 and 600 Buildings to meet current District standards. Work includes replacement of existing control devices, controllers, sensors, control wiring, and integration of associated HVAC equipment into the District's building automation system. Replace the Salon HVAC system, including removal of the existing system and installation of a new rooftop unit, associated ductwork modifications, controls integration, and any required structural reinforcement to support the new equipment. Provide additional electrical circuits in classrooms as indicated on the drawings, including new branch circuit wiring, devices, and panelboard connections. Provide all associated demolition, modifications, and system connections necessary to complete the work.
Posted Date
Mar 10, 2026
Due Date
Mar 31, 2026
Release: Mar 10, 2026
Evergreen High School
Close: Mar 31, 2026
The general scope of work includes Provide a full building HVAC controls upgrade for the 500 and 600 Buildings to meet current District standards. Work includes replacement of existing control devices, controllers, sensors, control wiring, and integration of associated HVAC equipment into the District's building automation system. Replace the Salon HVAC system, including removal of the existing system and installation of a new rooftop unit, associated ductwork modifications, controls integration, and any required structural reinforcement to support the new equipment. Provide additional electrical circuits in classrooms as indicated on the drawings, including new branch circuit wiring, devices, and panelboard connections. Provide all associated demolition, modifications, and system connections necessary to complete the work.
Evergreen High School
Qualified Building Envelope Consulting firms to provide services for the Cascadia Tech Academy at Buildings 100, 200 & 300. This project scope will be roof resurfacing and addressing failing roof penetrations at the buildings.
Posted Date
Nov 17, 2025
Due Date
Dec 8, 2025
Release: Nov 17, 2025
Evergreen High School
Close: Dec 8, 2025
Qualified Building Envelope Consulting firms to provide services for the Cascadia Tech Academy at Buildings 100, 200 & 300. This project scope will be roof resurfacing and addressing failing roof penetrations at the buildings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here—pivot to coops or resellers.
Coops: Start with a piggyback via Sourcewell, WSIPC, or OMNIA.
Evergreen School District 114, WA shows strict adherence to competitive procurement with no history of sole source awards.
Track Evergreen High School's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database