Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Evans City Borough Municipal Authority
Installation of approx. 1,300 LF of 6" HDPE water main via directional drilling, 1 fire hydrant, and multiple service lines.
Posted Date
Apr 14, 2026
Due Date
May 5, 2026
Release: Apr 14, 2026
Evans City Borough Municipal Authority
Close: May 5, 2026
Installation of approx. 1,300 LF of 6" HDPE water main via directional drilling, 1 fire hydrant, and multiple service lines.
AvailableEvans City Borough Municipal Authority
Construction of the Callery Pump Station Relocation Project. Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally boring approx. 600 LF of 6" HPDE force main, approx. 800 LF of 4" HDPE electrical conduit, and approx. 800 LF of 2" HDPE gas service line. Installation of approx. 600 LF of new 10" gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment of existing sewers, and tying new force main into existing force main.
Posted Date
Aug 11, 2025
Due Date
Sep 10, 2025
Release: Aug 11, 2025
Evans City Borough Municipal Authority
Close: Sep 10, 2025
Construction of the Callery Pump Station Relocation Project. Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally boring approx. 600 LF of 6" HPDE force main, approx. 800 LF of 4" HDPE electrical conduit, and approx. 800 LF of 2" HDPE gas service line. Installation of approx. 600 LF of new 10" gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment of existing sewers, and tying new force main into existing force main.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Evans City Borough Municipal Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database