Bayview Marshes and Sanford Ditch Project
Posted
Aug 31, 2026
Sep 28, 2026
Combination of three independently designed and funded wetland improvement and ditch petition projects. Work includes 11,560 LF of dike rehabilitation; 955 LF of dike construction; 2,050 LF of dike removal. 1.8 acre wetland creation; 4,021 LF of ditch dip out; 381 LF of conservation ditch construction; installation of dike/ditch plug with pipe and backflow preventer; installation of water control structure and 1,000 gal/min pump. Installation of water control structure and 4,500 gal/min bidirectional pump installation.

