Discover Opportunities months before the RFP drops
Learn more →Provide full time Athletic Trainer service for Men's and Women's Basketball team, Baseball and Softball team for a combined total of over 200 Student Athletes. Trainer should specialize in the prevention, assessment, treatment, and rehabilitation of student-athlete injuries, functioning as a crucial link between the athlete, coaches, and physicians, and providing care at practices, games, and team events.
Posted Date
Sep 8, 2025
Due Date
Sep 11, 2025
Release: Sep 8, 2025
Close: Sep 11, 2025
Provide full time Athletic Trainer service for Men's and Women's Basketball team, Baseball and Softball team for a combined total of over 200 Student Athletes. Trainer should specialize in the prevention, assessment, treatment, and rehabilitation of student-athlete injuries, functioning as a crucial link between the athlete, coaches, and physicians, and providing care at practices, games, and team events.
Provide cleaner air to the building by adding bi-polar ionization and better filtration. Work shall include but not be limited to replacing the existing air handler AH-J1. Remove and replace existing air handler and accessories as outlined in the construction documents and modify ductwork and piping as required for connection to new equipment. Including but not limited to replacing chilled water control valve and outside air damper. The contractor shall replace the end suction pump associated with building and accessories as outlined in the construction documents and modify piping as required for connection to new pump. The contractor shall re-insulate all ductwork in the mechanical room associated with the replaced AHUs, including supply air, return air, outside air, and mixed air ducts as applicable. All VAV boxes shall be replaced and new thermostats provided and installed as noted on plans. All ductwork shall be cleaned. Add ductless spit system to electrical room.
Posted Date
Feb 20, 2025
Due Date
Mar 26, 2025
Release: Feb 20, 2025
Close: Mar 26, 2025
Provide cleaner air to the building by adding bi-polar ionization and better filtration. Work shall include but not be limited to replacing the existing air handler AH-J1. Remove and replace existing air handler and accessories as outlined in the construction documents and modify ductwork and piping as required for connection to new equipment. Including but not limited to replacing chilled water control valve and outside air damper. The contractor shall replace the end suction pump associated with building and accessories as outlined in the construction documents and modify piping as required for connection to new pump. The contractor shall re-insulate all ductwork in the mechanical room associated with the replaced AHUs, including supply air, return air, outside air, and mixed air ducts as applicable. All VAV boxes shall be replaced and new thermostats provided and installed as noted on plans. All ductwork shall be cleaned. Add ductless spit system to electrical room.
Landscape & Grounds Maintenance.
Posted Date
Feb 6, 2025
Due Date
Mar 31, 2025
Release: Feb 6, 2025
Close: Mar 31, 2025
Landscape & Grounds Maintenance.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis