Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
East Fork Irrigation District
Furnish, offload, stage and install approx. 15,300-LF of 26" dia. to 6" dia. Solid-Wall HDPE Pipe and all Reducer, Bends, Tees, End Connection, Furnish and Install five Filtration and Pressure Reducing Stations, Provide associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration, Slip-line proposed HDPE through existing culverts at road crossings, Coordinate utility locations and relocations as necessary; coordinate with Owner and Owner's Engineer; and furnish and install all other associated flow control valves, stub turnouts, cleanout assemblies, air and vacuum valve assemblies, valves and valve cans, and appurtenances necessary to provide a complete project ready for irrigation delivery.
Posted Date
May 29, 2026
Due Date
Jun 30, 2026
Release: May 29, 2026
East Fork Irrigation District
Close: Jun 30, 2026
Furnish, offload, stage and install approx. 15,300-LF of 26" dia. to 6" dia. Solid-Wall HDPE Pipe and all Reducer, Bends, Tees, End Connection, Furnish and Install five Filtration and Pressure Reducing Stations, Provide associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration, Slip-line proposed HDPE through existing culverts at road crossings, Coordinate utility locations and relocations as necessary; coordinate with Owner and Owner's Engineer; and furnish and install all other associated flow control valves, stub turnouts, cleanout assemblies, air and vacuum valve assemblies, valves and valve cans, and appurtenances necessary to provide a complete project ready for irrigation delivery.
AvailableEast Fork Irrigation District
Supply and install approx. 26,000 LF of 28"-42" HDPE pipe, several thousand feet of 2"-12" pipe, two large pressure reducing stations, several smaller pressure reducing and pressure relief stations, irrigation connections, and stormwater culverts. Materials are primarily contractor-supplied.
Posted Date
Dec 12, 2024
Due Date
Jan 21, 2025
Release: Dec 12, 2024
East Fork Irrigation District
Close: Jan 21, 2025
Supply and install approx. 26,000 LF of 28"-42" HDPE pipe, several thousand feet of 2"-12" pipe, two large pressure reducing stations, several smaller pressure reducing and pressure relief stations, irrigation connections, and stormwater culverts. Materials are primarily contractor-supplied.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge