Learn more →Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
AvailableWork includes: providing Building Commissioning (Cx) services as an independent Commissioning Authority (CxA) for three projects: the Judicial Law Enforcement Center addition, the Judicial Law Enforcement Center renovation/remodel, and the Public Safety Building. Work includes coordinating with the architect, engineers, construction manager, and County staff to document, verify, and confirm that all new and remodeled facilities meet functional and performance requirements for occupants and operators and comply with applicable building rating system standards.
Posted Date
Nov 21, 2025
Due Date
Dec 12, 2025
Release: Nov 21, 2025
Close: Dec 12, 2025
Work includes: providing Building Commissioning (Cx) services as an independent Commissioning Authority (CxA) for three projects: the Judicial Law Enforcement Center addition, the Judicial Law Enforcement Center renovation/remodel, and the Public Safety Building. Work includes coordinating with the architect, engineers, construction manager, and County staff to document, verify, and confirm that all new and remodeled facilities meet functional and performance requirements for occupants and operators and comply with applicable building rating system standards.
AvailableProject consists of utilizing the existing roadbed as a shoo-fly during Phase I while constructing a 16'x10'x31' RCB. The north wingwalls will be constructed in Phase 2 after the RCB is backfilled and surfacing in place. Items included in this project are Clearing and Grubbing, Removal of Existing Structures, Foundation Stabilization, Concrete, Reinforcing Steel, Area Inlet, Cross Road Pipe, Grading, Select Soil, Rip Rap, Aggregate Ditch Lining, Aggregate Surfacing, Temporary Erosion Control, Seeding, and Traffic Control.
Posted Date
Nov 11, 2025
Due Date
Dec 2, 2025
Release: Nov 11, 2025
Close: Dec 2, 2025
Project consists of utilizing the existing roadbed as a shoo-fly during Phase I while constructing a 16'x10'x31' RCB. The north wingwalls will be constructed in Phase 2 after the RCB is backfilled and surfacing in place. Items included in this project are Clearing and Grubbing, Removal of Existing Structures, Foundation Stabilization, Concrete, Reinforcing Steel, Area Inlet, Cross Road Pipe, Grading, Select Soil, Rip Rap, Aggregate Ditch Lining, Aggregate Surfacing, Temporary Erosion Control, Seeding, and Traffic Control.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis