Dominican University New York - Nursing Simulation Lab RFP
Posted
Nov 20, 2026
Dec 16, 2026
Provide temporary protection to separate work area from students and staff. Demolish existing classroom, support and corridor spaces. Remove existing mechanical distribution components and local controls. Note that existing building- wide systems remain in place and will be used to support the new construction. Remove existing electrical lighting, power distribution components, and local controls. Note that existing building-wide systems remain in place and will be used to support the new construction. Remove existing plumbing and fire protection fixtures and trim. Note that existing building-wide systems remain in place and will be used to support the new construction. Provide floor, wall and ceiling finishes. Note level 5 gwb finish required in immersive room. Provide hvac systems and controls.


